Panorama of Vinh - Cua Lo Boulevard - the most modern traffic route in Nghe An
Thanh Cuong•DNUM_CJZAIZCACE 11:31
After 2 years of construction, the billion-dollar Vinh - Cua Lo boulevard has officially opened to traffic. For now, vehicles are allowed to travel on the route at a maximum speed of 50km/h.
Vinh - Cua Lo Boulevard: Video: Thanh CuongVinh - Cua Lo Boulevard was approved for investment in Nghe An province in 2010. This is the most modern major traffic route in Nghe An province with a length of 10.8 km, passing through the following areas: Vinh city, Nghi Loc district and Cua Lo town. After 4 years, due to capital adjustment, the project was adjusted and divided into 2 phases. The Boulevard has a main route designed with 8 lanes for motor vehicles, each side has 4 lanes 16m wide; the median strip is 21m - 216m wide; the median strip between the main route and the service road is 3m wide on each side and the sidewalks on both sides are 9m wide on each side. Photo: Thanh CuongPhase I has a total investment of 1,400 billion VND, implementation period from 2017 - 2021, starting point Vinh - Cua Lo Boulevard has an intersection with Le Nin Boulevard, the end point intersects with Binh Minh road, Cua Lo town. Phase 1 completed the opening of 2 mixed lanes, each lane is 9m wide. Photo: Thanh CuongPhase II has a total investment of VND1,415 billion. This phase will start construction in mid-2022 with the Nghe An Department of Transport as the investor. After completing both phases, Vinh - Cua Lo Boulevard will have 2-way roads with 12 lanes, including 2 mixed lanes along each side of the route. Photo: Thanh Cuong The first section of Vinh - Cua Lo Avenue. Photo: Thanh CuongAfter the opening, there were many vehicles circulating on Vinh - Cua Lo Boulevard. Photo: Quang AnAfter the opening date of August 29, 2024, the construction unit will continue to complete the remaining items of the project. It is expected that all items will be completed by October 30, 2024. In the immediate future, vehicles are allowed to travel on the route at a maximum speed of 50km/h. Photo: Quang AnVehicles traveling on both the main road and the service road on Vinh - Cua Lo Boulevard on the morning of August 29. Photo: Quang AnTraffic police direct traffic on Vinh - Cua Lo Boulevard. Photo: Quang AnA section of the most modern avenue in Nghe An. Photo: Thanh CuongUpon completion, Vinh - Cua Lo Boulevard is expected to create a traffic axis quickly connecting the two urban areas of Vinh city and Cua Lo town, forming an architectural space axis, creating a basis for attracting construction investment, promoting socio-economic development of the whole region. Photo: Thanh CuongIn addition, the project will overcome traffic congestion on the feeder road (phase 1 of the project has been invested in), especially during the peak tourist season in Cua Lo. Photo: Thanh CuongVinh - Cua Lo Boulevard connects with the coastal route, contributing to promoting economic development and ensuring national defense and security. Photo: Thanh Cuong