Giant robot constructs Saigon metro station number 1

September 23, 2017 19:31

The 90-meter-long, 300-ton TBM (robot TBM) from Japan was assembled by the construction unit to dig the metro tunnel from Ba Son station to City Theater station.

According to VNE

RELATED NEWS