Giant robot constructs Saigon metro station No. 1
The 90-meter-long, 300-ton underground boring machine (TBM robot) from Japan was assembled by the construction unit to dig the metro tunnel from Ba Son station to City Theater station.
According to VNE
RELATED NEWS |
---|