Friday, September 26, 2025
Vietnamese
Vietnamese
English
French
Русский
中文
Nghe An News
Nghe An Daily Newspaper
Nghe An weekend
Log in
Nghe An Newspaper:
Nghe An Television:
Latest
Current events
Forum
Human resources
Party building
Everyday beauty
Protecting the ideological foundation
Economy
Industrial
New rural construction
Agriculture
Market
Agricultural extension
Real estate
Car
International
Comment
News
Society
Bridge of Love
Religion - Belief
Culture
Defense
Tourism
Poetry - Stories
Anti-waste
Streamlining the apparatus
Education
Law
Security - Order
Advise
Case file
Sport
SLNA
Highlight
Domestic
Nghe An Newspaper Cup
International
Business Connection
Classifieds
New policy
Video
Society
Sport
National defense and security
Reportage - Chronicle
Cars and life
Current events
Discover
Entertainment
People ask, authorities answer
TV
Image
Health
Advise
Medicine & Nutrition
Health & Beauty
News
Labor
Job
Latest
Nghe An News
Nghe An Daily Newspaper
Nghe An weekend
Current events
Forum
Human resources
Party building
Everyday beauty
Protecting the ideological foundation
Economy
Industrial
New rural construction
Agriculture
Market
Agricultural extension
Real estate
Car
International
Comment
News
Society
Bridge of Love
Religion - Belief
Culture
Defense
Tourism
Poetry - Stories
Anti-waste
Streamlining the apparatus
Education
Law
Security - Order
Advise
Case file
Sport
SLNA
Highlight
Domestic
Nghe An Newspaper Cup
International
Business Connection
Classifieds
New policy
Video
Society
Sport
National defense and security
Reportage - Chronicle
Cars and life
Current events
Discover
Entertainment
People ask, authorities answer
TV
Image
Health
Advise
Medicine & Nutrition
Health & Beauty
News
Labor
Job
Entertainment
Showbiz
Short Video
Reflection
Digital transformation
Technology
Infographics
eMagazine
Podcast
Nghe An language
Literature and art
Go to Nghe An
Nghe people far from home
Land and People
West
Reportage
Party Congress
National Party Congress
Nghe An Provincial Party Congresses
Executive Committee of Nghe An Provincial Party Committee
Party Congresses at all levels for the 2025 - 2030 term
Comments on Documents
News
Q&A
List of delegates
Blueprint
News updates related to Drawings
Ban Ve Hydropower Plant will discharge water from 8am on September 24 to reduce pressure on downstream.
Faced with the complicated flood situation in the area, in order to ensure safety for the downstream area, Ban Ve Hydropower Company will discharge water from the reservoir from 8:00 a.m. on September 24, 2025 according to Operation Order No. 931/BCH of the Civil Defense Command of Nghe An province, issued at 3:45 p.m. on September 23, 2025.
Law
Discharging water from Ban Ve Hydropower Reservoir to respond to storm No. 9
Faced with the complicated developments of storm No. 9 and the risk of major flooding in the Ca River basin, on September 23, 2025, the Nghe An Provincial Civil Defense Command issued an Order to operate the Ban Ve Hydropower Reservoir to ensure the safety of the project and minimize damage to the downstream area.
Huu Khuong - Awakening inner strength from a difficult "oasis"
Huu Khuong Commune, an isolated mountainous “oasis” of Nghe An with rugged terrain and many difficulties, is gradually rising up to develop its economy and society. By promoting the strength of solidarity, focusing on building human resources and improving infrastructure, the locality has created a solid foundation for sustainable development, improving people’s lives and preserving traditional cultural values.
Ban Ve Hydropower Company gives gifts to students on the occasion of the new school year opening in Yen Na, Luong Minh and Huu Khuong communes.
On the morning of September 5, joining the bustling atmosphere of the Opening Ceremony of the 2025-2026 school year, Ban Ve Hydropower Company organized many working delegations to visit and present gifts to schools in Yen Na, Luong Minh and Huu Khuong communes. The total value of the gifts was nearly 200 million VND, a practical source of encouragement for students in mountainous areas with many difficulties.
Struggling to clean up trash in Ban Ve hydroelectric reservoir after many consecutive floods
After storm No. 3 at the end of July, and then consecutive storms No. 5 and No. 6, the Ban Ve hydroelectric reservoir was flooded with waste. Thousands of tons of rotten wood, bamboo, plastic waste from all streams, rivers, and streams in Laos and the western region of Nghe An poured in, turning the lake surface into a giant floating scrap yard. The collection became a difficult "battle", and before one batch could be finished, another batch had already arrived.
Searching for victims involved in concert ticket scam
The Criminal Police Department issued a notice to search for people who were defrauded by Dang The Di using the trick of selling concert tickets.
Ban Ve Hydropower Plant actively regulates water, contributing to flood reduction of about 74% for downstream areas.
Facing the risk of flooding due to the impact of storm No. 5, Ban Ve Hydropower Plant plays an important role by proactively reducing discharge flow, contributing to cutting floods by about 74% for the downstream of Lam River, especially in the old Con Cuong district - where there is prolonged heavy rain.
Ban Ve Hydropower Plant proactively reduces floods and protects downstream areas from the impact of storm No. 5
August 26, 2025 07:22
Faced with the direct impact of storm No. 5 causing heavy rain in the upstream area, Ban Ve Hydropower Plant has proactively deployed measures to regulate the reservoir to minimize the risk of flooding in the downstream area.
Leaders of Power Generation Corporation 1 directly commanded at Ban Ve Hydropower Plant, proactively responding to storm No. 5, ensuring safety for downstream areas.
August 25, 2025 11:02
Faced with the complicated developments and risk of serious impacts from storm No. 5, on August 25, leaders of Power Generation Corporation 1 (EVNGENCO1) were present at Ban Ve Hydropower Plant to inspect the situation and direct flood response work.
From 3:30 p.m. this afternoon (August 23), Ban Ve Hydropower Company will lower the lake water level to welcome floods.
August 23, 2025 14:53
Implementing the Order of the Head of the Steering Committee for Natural Disaster Prevention, Search and Rescue and Civil Defense of Nghe An province, from 3:30 p.m. this afternoon (August 23), Ban Ve Hydropower Company will lower the lake water level to welcome floods.
Police continue to summon subjects posting fabricated information about the collapse of the Ban Ve Hydropower Dam.
July 28, 2025 17:09
Nghe An police continue to summon subjects who posted false information related to sharing and spreading information about the collapse of the Ban Ve Hydropower Dam, to work and handle according to the provisions of the law.
Summoned the subject who posted false information about the Ban Ve Hydropower Dam collapse
July 27, 2025 21:26
On the afternoon of July 27, some information appeared on social networks saying that the Ban Ve Hydropower Plant (Yen Na Commune, Nghe An Province) had broken. This information quickly spread, causing hundreds of households living in the communes downstream of the Ban Ve Hydropower Plant to panic and flee to the mountains to avoid rising floods.
Police investigate the person spreading false news about the dam collapse at Ban Ve Hydropower Plant.
July 27, 2025 19:18
In response to false information spreading on social networks about the collapse of the Ban Ve Hydropower Dam, Nghe An Provincial Police have stepped in to verify the subject spreading false information, causing public panic and affecting security and order in the area.
Director of Ban Ve Hydropower Company confirmed that the information about the dam breaking at the factory is a false rumor.
July 27, 2025 18:06
In response to information spreading on social networks that the Ban Ve Hydropower Dam had broken, Mr. Ta Huu Hung - Director of Ban Ve Hydropower Company affirmed that it was a false rumor and not true.
EVNGENCO1 and Ban Ve Hydropower Company donated 1 billion VND to support people in communes in Western Nghe An affected by floods.
July 27, 2025 17:38
On July 27, Power Generation Corporation 1 (EVNGENCO1) in coordination with Ban Ve Hydropower Company directly visited, shared and supported people affected by storm No. 3 in the western communes of Nghe An province.
Water flow to Ban Ve hydroelectric reservoir continues to decrease, the plant regulates flood reduction for downstream
July 26, 2025 19:06
On July 26, the water flow to Ban Ve hydroelectric reservoir was 1,100m3/s, this is the lowest level in recent days of flood.
How Nghe An responds to historic floods in western communes
July 25, 2025 17:38
In recent days, many highland communes in Nghe An have suffered unprecedented floods, with the amount of water flowing into the Ban Ve hydropower reservoir being three times higher than the flood in 2018. To respond, local authorities as well as relevant units have had to stay up all night, racing against time to ensure people's safety and minimize damage. In particular, the response to the flood has also shown the effectiveness of the newly-established two-level government.
Ban Ve Hydropower Plant reduces discharge by half compared to July 23
July 24, 2025 14:16
After recording that the amount of water flowing into the lake had decreased by more than half compared to yesterday (July 23), Ban Ve Hydropower Plant adjusted the flood discharge flow down.
Ban Ve Hydropower Company cooperated with the Economic Police Department of Nghe An Police to give gifts to policy families in Son Lam commune.
July 24, 2025 11:42
On the occasion of the War Invalids and Martyrs Day, July 27, Ban Ve Hydropower Company coordinated with the Economic Police Department of Nghe An Provincial Police to organize a program to pay tribute to wounded soldiers and families of martyrs in Son Lam commune (merged Ngoc Lam commune and Thanh Son commune of the old Thanh Chuong district), Nghe An province.
Deputy Minister of Agriculture and Environment Nguyen Hoang Hiep inspected the operation of Ban Ve Hydropower Reservoir.
July 23, 2025 18:02
On the afternoon of July 23, a working delegation of the Ministry of Agriculture and Environment led by Deputy Minister Nguyen Hoang Hiep inspected the operation and regulation of the reservoir at Ban Ve Hydropower Plant to ensure the safety of the project and the downstream area against the impact of storm No. 3.
Director of Department of Industry and Trade talks about the historic flood in Western Nghe An
July 23, 2025 16:09
Director of the Department of Industry and Trade Pham Van Hoa said that in the early morning of July 23, the flood in Ban Ve hydropower reservoir reached its peak with a flow of 12,800m3/s, an unprecedented level, 3 times higher than the 2018 flood.
Floods exceed peak, Ban Ve Hydropower Plant cuts 74% of flow downstream
July 23, 2025 11:51
Due to the impact of storm No. 3, an exceptionally large flood occurred in the Ban Ve Hydropower Reservoir basin, exceeding the flood control frequency, with a peak flow of up to 12,800 m³/s at 2:00 a.m. on July 23. In response to the emergency, Ban Ve Hydropower Company promptly switched to an unusual operation mode, cutting down the flood flow to the downstream by up to 74%, contributing significantly to limiting damage caused by flooding.
See more
POWERED BY
ONE
CMS
- A PRODUCT OF
NEKO