Ba Den Mountain: hiking trail reopens from December 12th, with time restrictions.

CTVXDecember 11, 2025 11:32

Climbing Mount Ba Den will reopen on December 12th after more than two months due to the storm; only the Power Line route will be open, starting from 5 am to 11 am, registration is at the foot of the mountain, and please note that power cables are currently being dismantled.

Mount Ba Den will reopen for climbing and hiking activities from December 12th, after more than two months of suspension due to storms and heavy rain. Currently, only groups are allowed.The road runs along the system of power poles (Power Pole Road)., withDeparture times are from 5 AM to 11 AM daily.andRegistration of information is mandatory at the security checkpoint at the foot of the mountain..

This information was provided by a representative of the Ba Den Mountain National Tourist Area Management Board on December 10th. Regulations regarding departure times and registration aim to control the number of people and support rescue efforts when needed.

Đỉnh Núi Bà Đen. Ảnh: Hải Triều
Mount Ba Den peak. Photo: Hai Trieu

How to get along the Electric Pole route?

The reopened route is a road that runs along the system of power poles, commonly known asElectric Pole RoadVisitors need to depart between 5:00 AM and 11:00 AM, register at the security checkpoint at the foot of the mountain, and follow the instructions of the authorities throughout the journey.

The management team notes that the power cable system on the Power Pole route is currently under construction.dismantling, constructionHikers must observe the surroundings, follow directions, and only access permitted areas. An emergency hotline has been announced to assist climbers when needed.

Một cung đường leo lên đỉnh Bà Đen. Ảnh: Trần Sang
A trail leading to the summit of Ba Den Mountain. Photo: Tran Sang

Safety and environmental protection regulations

  • Depart between 5:00 AM and 11:00 AM; register your information at the security checkpoint at the foot of the mountain.
  • Follow the instructions of the authorities, especially in areas where power lines are being dismantled or installed.
  • Do not carry explosives or toxic chemicals.
  • Do not litter, do not damage forest trees; do not harvest resources in the conservation area.

Why did I temporarily stop trekking?

Trekking activities on Mount Ba Den were temporarily suspended from the beginning of October 2025 due to Typhoon Bualoi. Prolonged heavy rain caused localized landslides, and the hilly terrain became slippery, posing a safety risk to tourists. After controlling the risk factors, the road route along the Power Pole was reopened under controlled conditions.

A brief overview of Ba Den Mountain

Mount Ba Den, at 986 meters, is the highest mountain in Southern Vietnam. Besides the hiking trail, the tourist area features a cable car system that takes visitors to Ba Den Temple and the summit. It attracts a large number of young people who choose to experience mountain climbing on weekends.

Quick information

Content Detail
Reopening date 12/12
Permitted route Roads that run alongside the power pole system (Power Pole Road)
Departure time 5am-11am daily
Procedure Register your information at the security checkpoint at the foot of the mountain.
Safety Note The power poles are being dismantled and power cables are being installed; follow instructions.
0 0 0
x
Ba Den Mountain: hiking trail reopens from December 12th, with time restrictions.
Google News
POWERED BYFREECMS- A PRODUCT OFNEKO