Law

Remove the unauthorized level crossings over the railway line in Quynh Luu district.

Viet Hung May 23, 2025 17:11

On the morning of May 23rd, Nghe Tinh Railway Joint Stock Company, in coordination with Railway Traffic Police Team No. 1 (Department 6, Traffic Police Department, Ministry of Public Security), Nghe An Traffic Police Department, and local authorities, removed and reduced the number of unauthorized crossings over the railway line in Quynh Son commune, Quynh Luu district.

Authorities have deployed cranes to the scene to remove the unauthorized crossings over the railway tracks at Km258 + 840 and Km259 + 010 on the Hanoi - Ho Chi Minh City railway line, in Quynh Son commune, Quynh Luu district.

a1(1).jpg
The railway industry and local authorities are working together to eliminate unauthorized crossings over the railway tracks. Photo: Viet Hung

These unauthorized crossings over the railway are primarily for transportation and agricultural purposes, but they lack guards, barriers, and warning lights. Many of the bends obstruct visibility, and the areas adjacent to the railway are rough, rocky, and slippery, posing a significant risk of traffic accidents.

a2(1).jpg
Machinery was mobilized to excavate and fill in the illegally created pathways, prohibiting people and vehicles from passing through. Photo: Viet Hung

Eliminating unauthorized level crossings is a correct policy aimed at promptly preventing and mitigating traffic accidents.

a4(1).jpg
Removing unauthorized level crossings is an important step that contributes to ensuring traffic safety on the North-South railway line. Photo: Viet Hung

Initially, people may not be familiar with the new route and may have to take a longer detour than the unofficial crossing, but in the long run, it will contribute to ensuring traffic safety on the North-South railway line.

0 0 0
x
Remove the unauthorized level crossings over the railway line in Quynh Luu district.
Google News
POWERED BYFREECMS- A PRODUCT OFNEKO