Reinforce more boulders and gravel where the Ban Vang dam body is broken.
(Baonghean.vn) - After promptly fixing the Ban Vang dam break on the night of September 15, to ensure safety during the rainy season, Tien Thanh commune (Yen Thanh) reinforced the dam body with more boulders and gravel to increase its strength.
![]() |
Reinforcing the broken section of Ban Vang dam in Tien Thanh commune (Yen Thanh) with more boulders and gravel. Photo: Van Truong. |
Mr. Phan Van Vu - Chairman of Tien Thanh Commune People's Committee (Yen Thanh)said: After promptly fixing the Ban Vang dam break on the night of September 15, to ensure safety during the rainy season, the commune reinforced the broken point with more boulders and gravel to increase strength. A layer of gravel was poured on top of the broken dam body to make it easier for people to travel.
![]() |
Youth Union members of Tien Thanh commune cover both sides of the broken dike with tarps to prevent erosion. Photo: Van Truong |
According to the report of Tien Thanh Commune People's Committee, the pointdam breakover 5 meters long, the commune mobilized forces to reinforce over 400 meters3Soil, rock, sand, the broken section upstream and downstream are all covered with tarpaulins on both sides of the dam body to prevent erosion. At both ends of the broken section of the dam body, the commune has posted warning signs of danger for traffic participants to know.
![]() |
At both ends of the broken dam, the commune has placed warning signs to inform traffic participants of the danger. Photo: Van Truong |
Tien Thanh commune currently has 7 large and small reservoirs, of which 4 are managed by the locality: Ban Vang 1, Ban Vang 2, Choac Trong, Vap Bap, all of which have degraded, the dam body is built with handmade soil, so it is weak. In the long term, the commune is in dire need of the State's attention and investment in upgrading, to both store water and ensure the safety of the downstream area during the rainy season.

Timely repair of Ban Vang dam collapse in Yen Thanh district
(Baonghean.vn) - The Ban Vang dam collapse incident in Tien Thanh commune, Yen Thanh occurred on the afternoon of September 15. Comrade Hoang Nghia Hieu - Member of the Provincial Party Committee, Vice Chairman of the Provincial People's Committee and the working delegation were present in time to directly direct the handling of the incident.

Bara Do Luong spillway failure incident resolved
(Baonghean.vn) - After 3 days of continuous construction day and night, on the morning of June 10, the Do Luong spillway collapse incident was resolved.