Power outage schedule in Hanoi today December 27, 2024
According to Hanoi Electricity, there is a scheduled power outage in districts in Hanoi on December 27, 2024.
The latest information on power outage schedule in Hanoi areas on Friday, December 27, 2024 is updated from the Hanoi Electricity portal.
There can be many reasons for power outages in Hanoi. Factors that can cause power outages include natural disasters, floods, storms, or the management unit carrying out repairs and maintenance of power grid lines.

This is the power outage schedule in the plan of the power companies. Depending on the weather situation, the plan of the power units... the power outage schedule can be adjusted and postponed in some places.
Hanoi power outage schedule on December 27, 2024
Electricity | Time | Area | Reason | Status |
Soc Son Power | From 07:00 to 14:00 | Part of Bac Son commune | Serving the renovation and upgrading of the power grid | Approved |
Soc Son Power | From 06:30 to 12:30 | Part of Tan Minh commune | Serving the renovation and upgrading of the power grid | Approved |
Soc Son Power | From 07:30 to 10:30 | Part of Tan Minh commune | Serving the renovation and upgrading of the power grid | Approved |
Soc Son Power | From 07:30 to 10:30 | Part of Tan Minh commune | Serving the renovation and upgrading of the power grid | Approved |
Long Bien Electricity | From 07:00 to 14:00 | Customers in Giang Bien ward, Quang province | Serving the renovation and upgrading of the power grid | Postpone |
Long Bien Electricity | From 08:00 to 16:00 | Group 12 - 16 Bo De Ward | Serving the renovation and upgrading of the power grid | Approved |
Long Bien Electricity | From 07:00 to 14:00 | Customers in Giang Bien ward, Quang province | Serving the renovation and upgrading of the power grid | Postpone |
Long Bien Electricity | From 07:00 to 14:00 | Customers in Giang Bien ward, Quang province | Serving the renovation and upgrading of the power grid | Postpone |
Long Bien Electricity | From 08:00 to 16:00 | Group 12 - 16 Bo De Ward | Serving the renovation and upgrading of the power grid | Approved |
Long Bien Electricity | From 07:00 to 14:00 | Customers in Giang Bien ward, Quang province | Serving the renovation and upgrading of the power grid | Postpone |
Long Bien Electricity | From 07:00 to 14:00 | Customers in Giang Bien ward, Quang province | Serving the renovation and upgrading of the power grid | Postpone |
Long Bien Electricity | From 08:00 to 16:00 | Group 12 - 16 Bo De Ward | Serving the renovation and upgrading of the power grid | Approved |
Long Bien Electricity | From 08:00 to 16:00 | Group 12 - 16 Bo De Ward | Serving the renovation and upgrading of the power grid | Approved |
Long Bien Electricity | From 07:00 to 14:00 | Customers in Giang Bien ward, Quang province | Serving the renovation and upgrading of the power grid | Postpone |
Thanh Tri Electricity | From 08:00 to 15:00 | Tu Hiep Urban Area Construction Station | Serving the renovation and upgrading of the power grid | Approved |
Long Bien Electricity | From 08:00 to 16:00 | Group 12 - 16 Bo De Ward | Serving the renovation and upgrading of the power grid | Approved |
Long Bien Electricity | From 07:00 to 14:00 | Customers in Giang Bien ward, Quang province | Serving the renovation and upgrading of the power grid | Postpone |
Long Bien Electricity | From 08:00 to 16:00 | Group 12 - 16 Bo De Ward | Serving the renovation and upgrading of the power grid | Approved |
Ba Dinh Electricity | From 00:00 to 08:00 | No (Transfer low voltage T1, T3 to load T2, T4) | Serving the renovation and upgrading of the power grid | Approved |
Ba Dinh Electricity | From 08:00 to 17:00 | No (Transfer low voltage T2, T4 to load T1, T3) | Serving the renovation and upgrading of the power grid | Approved |
Soc Son Power | From 06:30 to 12:30 | Part of Tan Minh commune | Serving the renovation and upgrading of the power grid | Approved |
Soc Son Power | From 07:00 to 14:00 | Part of Bac Son commune | Serving the renovation and upgrading of the power grid | Approved |
Soc Son Power | From 07:30 to 10:30 | Part of Tan Minh commune | Serving the renovation and upgrading of the power grid | Approved |
Soc Son Power | From 06:30 to 12:30 | Part of Tan Minh commune | Serving the renovation and upgrading of the power grid | Approved |
Soc Son Power | From 07:00 to 14:00 | Part of Bac Son commune | Serving the renovation and upgrading of the power grid | Approved |
Soc Son Power | From 07:30 to 10:30 | Part of Tan Minh commune | Serving the renovation and upgrading of the power grid | Approved |
Soc Son Power | From 06:30 to 12:30 | Part of Tan Minh commune | Serving the renovation and upgrading of the power grid | Approved |
Hoang Mai Electricity | From 05:30 to 13:00 | Part of Hoang Liet ward | Serving the renovation and upgrading of the power grid | Approved |
Soc Son Power | From 06:30 to 12:30 | Part of Tan Minh commune | Serving the renovation and upgrading of the power grid | Approved |
Soc Son Power | From 07:30 to 10:30 | Part of Tan Minh commune | Serving the renovation and upgrading of the power grid | Approved |
Soc Son Power | From 07:30 to 10:30 | Part of Tan Minh commune | Serving the renovation and upgrading of the power grid | Approved |
Soc Son Power | From 07:00 to 14:00 | Part of Bac Son commune | Serving the renovation and upgrading of the power grid | Approved |
Soc Son Power | From 07:00 to 14:00 | Part of Bac Son commune | Serving the renovation and upgrading of the power grid | Approved |
Soc Son Power | From 06:30 to 12:30 | Part of Tan Minh commune | Serving the renovation and upgrading of the power grid | Approved |
Soc Son Power | From 07:00 to 14:00 | Part of Bac Son commune | Serving the renovation and upgrading of the power grid | Approved |
Soc Son Power | From 06:30 to 12:30 | Part of Tan Minh commune | Serving the renovation and upgrading of the power grid | Approved |
Soc Son Power | From 07:00 to 14:00 | Part of Bac Son commune | Serving the renovation and upgrading of the power grid | Approved |
Soc Son Power | From 06:30 to 12:30 | Part of Tan Minh commune | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 06:00 to 14:00 | TT1, BT3, 4 Van Phu Urban Area | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 07:00 to 10:00 | Part of residential group 1, 2, Yen Nghia ward | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 08:00 to 10:00 | Vo Thi Sau Street, Alley 2, Cau Do 4 Area, Cau Do 3 Area, Quang Trung Street from the beginning of Le Loi Street to house number 167 Quang Trung | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 08:00 to 12:00 | Ba Trieu Town Area, Residential Group 11 - Nguyen Trai Ward; Social Insurance Training School | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 08:00 to 12:00 | Song Nhue Irrigation Development Investment One Member Limited Liability Company, Song Nhue Irrigation Company Resettlement Area, Kien Hung Ward | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 09:30 to 11:30 | Teachers' Housing Area, Riverbank Road, Lane 7, Ha Tri 1 Area | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 14:00 to 16:00 | CT2 Ha Cau Apartment | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 14:00 to 17:00 | Along Nhue Giang street (from Cau Trang to Cau Den); Financial center; Bui Bang Doan street | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 14:00 to 16:00 | House numbers 1 to 107 Be Van Dan Street, Quang Trung Street from number 12 to 78 | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 15:30 to 17:30 | Alley 1, 2 and part of Ngo Thi Nham street | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 15:30 to 17:30 | Retirement Alley and Alley 1, Ha Tri Area 1, Ha Cau Ward | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 08:00 to 12:00 | Part of TT19 row, BT2 Van Quan urban area | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 14:00 to 16:00 | House numbers 1 to 107 Be Van Dan Street, Quang Trung Street from number 12 to 78 | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 14:00 to 17:00 | Technology Center, Residential Group 2, 3, Van Quan Ward | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 07:00 to 10:00 | Part of residential group 1, 2, Yen Nghia ward | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 08:00 to 12:00 | Ba Trieu Town Area, Residential Group 11 - Nguyen Trai Ward; Social Insurance Training School | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 09:00 to 12:00 | Part of residential group 15, Dong Mai ward | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 09:30 to 11:30 | TDP 8, Food Complex, Quang Trung Street from 169 to 267 | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 14:00 to 16:00 | House numbers 1 to 107 Be Van Dan Street, Quang Trung Street from number 12 to 78 | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 15:30 to 17:30 | Retirement Alley and Alley 1, Ha Tri Area 1, Ha Cau Ward | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 06:00 to 14:00 | TT1, BT3, 4 Van Phu Urban Area | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 08:00 to 12:00 | Song Nhue Irrigation Development Investment One Member Limited Liability Company, Song Nhue Irrigation Company Resettlement Area, Kien Hung Ward | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 08:00 to 10:00 | Part of residential group Ha Tri 1, 3, lane 8 Ha Tri 1. | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 08:00 to 12:00 | Part of TT19 row, BT2 Van Quan urban area | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 08:00 to 10:00 | Vo Thi Sau Street, Alley 2, Cau Do 4 Area, Cau Do 3 Area, Quang Trung Street from the beginning of Le Loi Street to house number 167 Quang Trung | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 14:00 to 17:00 | Xa La Residential Area – Phuc La Ward | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 14:00 to 17:00 | Technology Center, Residential Group 2, 3, Van Quan Ward | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 15:30 to 17:30 | Alley 1, 2 and part of Ngo Thi Nham street | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 06:00 to 14:00 | TT1, BT3, 4 Van Phu Urban Area | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 06:30 to 14:30 | Son Ha parking lot | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 07:00 to 10:00 | Part of residential group 1, 2, Yen Nghia ward | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 08:00 to 10:00 | Vo Thi Sau Street, Alley 2, Cau Do 4 Area, Cau Do 3 Area, Quang Trung Street from the beginning of Le Loi Street to house number 167 Quang Trung | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 09:30 to 11:30 | TDP 8, Food Complex, Quang Trung Street from 169 to 267 | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 14:00 to 16:00 | House numbers 1 to 107 Be Van Dan Street, Quang Trung Street from number 12 to 78 | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 14:00 to 16:00 | CT2 Ha Cau Apartment | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 14:00 to 17:00 | Technology Center, Residential Group 2, 3, Van Quan Ward | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 15:30 to 17:30 | Alley 1, 2 and part of Ngo Thi Nham street | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 08:00 to 10:00 | Part of residential group Ha Tri 1, 3, lane 8 Ha Tri 1. | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 08:00 to 10:00 | Vo Thi Sau Street, Alley 2, Cau Do 4 Area, Cau Do 3 Area, Quang Trung Street from the beginning of Le Loi Street to house number 167 Quang Trung | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 09:30 to 11:30 | TDP 8, Food Complex, Quang Trung Street from 169 to 267 | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 14:00 to 17:00 | Xa La Residential Area – Phuc La Ward | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 08:00 to 12:00 | Ba Trieu Town Area, Residential Group 11 - Nguyen Trai Ward; Social Insurance Training School | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 08:00 to 10:00 | Part of residential group Ha Tri 1, 3, lane 8 Ha Tri 1. | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 08:00 to 10:00 | Vo Thi Sau Street, Alley 2, Cau Do 4 Area, Cau Do 3 Area, Quang Trung Street from the beginning of Le Loi Street to house number 167 Quang Trung | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 09:30 to 11:30 | Teachers' Housing Area, Riverbank Road, Lane 7, Ha Tri 1 Area | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 09:30 to 11:30 | TDP 8, Food Complex, Quang Trung Street from 169 to 267 | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 14:00 to 16:00 | CT2 Ha Cau Apartment | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 15:30 to 17:30 | Alley 1, 2 and part of Ngo Thi Nham street | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 15:30 to 17:30 | Retirement Alley and Alley 1, Ha Tri Area 1, Ha Cau Ward | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 06:00 to 14:00 | TT1, BT3, 4 Van Phu Urban Area | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 06:30 to 07:30 | Hanoi Motor Vehicle Inspection Center, Toyota Ha Dong Company Limited | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 11:30 to 12:30 | Hanoi Motor Vehicle Inspection Center, Toyota Ha Dong Company Limited | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 14:00 to 16:00 | House numbers 1 to 107 Be Van Dan Street, Quang Trung Street from number 12 to 78 | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 08:00 to 12:00 | Song Nhue Irrigation Development Investment One Member Limited Liability Company, Song Nhue Irrigation Company Resettlement Area, Kien Hung Ward | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 08:00 to 10:00 | Part of residential group Ha Tri 1, 3, lane 8 Ha Tri 1. | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 08:00 to 12:00 | Part of TT19 row, BT2 Van Quan urban area | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 08:00 to 10:00 | Vo Thi Sau Street, Alley 2, Cau Do 4 Area, Cau Do 3 Area, Quang Trung Street from the beginning of Le Loi Street to house number 167 Quang Trung | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 14:00 to 17:00 | Xa La Residential Area – Phuc La Ward | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 14:00 to 17:00 | Technology Center, Residential Group 2, 3, Van Quan Ward | Serving the renovation and upgrading of the power grid | Approved |
Son Tay Power | From 07:00 to 12:00 | Van Khe village, part of Nhan Ly village - Xuan Son commune | Serving the renovation and upgrading of the power grid | Approved |
Son Tay Power | From 07:00 to 12:00 | Van Khe village, part of Nhan Ly village - Xuan Son commune | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 08:00 to 10:00 | Vo Thi Sau Street, Alley 2, Cau Do 4 Area, Cau Do 3 Area, Quang Trung Street from the beginning of Le Loi Street to house number 167 Quang Trung | Serving the renovation and upgrading of the power grid | Approved |
Son Tay Power | From 07:00 to 12:00 | Van Khe village, part of Nhan Ly village - Xuan Son commune | Serving the renovation and upgrading of the power grid | Approved |
Son Tay Power | From 09:30 to 12:00 | Part of Z175 urban area - Xuan Son commune | Serving the renovation and upgrading of the power grid | Approved |
Son Tay Power | From 07:00 to 12:00 | Van Khe village, part of Nhan Ly village - Xuan Son commune | Serving the renovation and upgrading of the power grid | Approved |
Son Tay Power | From 09:30 to 12:00 | Part of Z175 urban area - Xuan Son commune | Serving the renovation and upgrading of the power grid | Approved |
Son Tay Power | From 07:00 to 12:00 | Van Khe village, part of Nhan Ly village - Xuan Son commune | Serving the renovation and upgrading of the power grid | Approved |
Son Tay Power | From 09:30 to 12:00 | Part of Z175 urban area - Xuan Son commune | Serving the renovation and upgrading of the power grid | Approved |
Thach That Electricity | From 08:30 to 15:00 | Vietnam National Museum of Ethnic Groups | Serving the renovation and upgrading of the power grid | Approved |
Ba Vi Electricity | From 07:00 to 10:30 | Part of customers are from Phu Cuong commune (Thanh Chieu village), Tan Hong commune (La Thuong village, La Pham 1, 2) | Serving the renovation and upgrading of the power grid | Approved |
Ba Vi Electricity | From 07:00 to 13:00 | Customers in Dong Thai commune (Tan Cau substation) | Serving the renovation and upgrading of the power grid | Approved |
Ba Vi Electricity | From 07:15 to 13:00 | Part of customers are from Vat Lai, Dong Thai, Phu Dong communes. | Serving the renovation and upgrading of the power grid | Approved |
Ba Vi Electricity | From 07:00 to 10:30 | Part of customers are from Phu Cuong commune (Thanh Chieu village), Tan Hong commune (La Thuong village, La Pham 1, 2) | Serving the renovation and upgrading of the power grid | Approved |
Ba Vi Electricity | From 07:00 to 13:00 | Customers in Dong Thai commune (Tan Cau substation) | Serving the renovation and upgrading of the power grid | Approved |
Ba Vi Electricity | From 07:15 to 13:00 | Part of customers are from Vat Lai, Dong Thai, Phu Dong communes. | Serving the renovation and upgrading of the power grid | Approved |
Ba Vi Electricity | From 07:15 to 13:00 | Part of customers are from Vat Lai, Dong Thai, Phu Dong communes. | Serving the renovation and upgrading of the power grid | Approved |
Ba Vi Electricity | From 07:15 to 13:00 | Part of customers are from Vat Lai, Dong Thai, Phu Dong communes. | Serving the renovation and upgrading of the power grid | Approved |
Ba Vi Electricity | From 07:00 to 10:30 | Part of customers are from Phu Cuong commune (Thanh Chieu village), Tan Hong commune (La Thuong village, La Pham 1, 2) | Serving the renovation and upgrading of the power grid | Approved |
Ba Vi Electricity | From 07:00 to 10:30 | Part of customers are from Phu Cuong commune (Thanh Chieu village), Tan Hong commune (La Thuong village, La Pham 1, 2) | Serving the renovation and upgrading of the power grid | Approved |
Ba Vi Electricity | From 07:00 to 10:30 | Part of customers are from Phu Cuong commune (Thanh Chieu village), Tan Hong commune (La Thuong village, La Pham 1, 2) | Serving the renovation and upgrading of the power grid | Approved |
Ba Vi Electricity | From 07:15 to 13:00 | Part of customers are from Vat Lai, Dong Thai, Phu Dong communes. | Serving the renovation and upgrading of the power grid | Approved |
Ba Vi Electricity | From 07:00 to 13:00 | Customers in Dong Thai commune (Tan Cau substation) | Serving the renovation and upgrading of the power grid | Approved |
Ba Vi Electricity | From 07:15 to 13:00 | Part of customers are from Vat Lai, Dong Thai, Phu Dong communes. | Serving the renovation and upgrading of the power grid | Approved |
Ba Vi Electricity | From 07:00 to 13:00 | Customers in Dong Thai commune (Tan Cau substation) | Serving the renovation and upgrading of the power grid | Approved |
Ba Vi Electricity | From 07:15 to 13:00 | Part of customers are from Vat Lai, Dong Thai, Phu Dong communes. | Serving the renovation and upgrading of the power grid | Approved |
Ba Vi Electricity | From 07:15 to 13:00 | Part of customers are from Vat Lai, Dong Thai, Phu Dong communes. | Serving the renovation and upgrading of the power grid | Approved |
Ba Vi Electricity | From 07:00 to 13:00 | Customers in Dong Thai commune (Tan Cau substation) | Serving the renovation and upgrading of the power grid | Approved |
Ba Vi Electricity | From 07:15 to 13:00 | Part of customers are from Vat Lai, Dong Thai, Phu Dong communes. | Serving the renovation and upgrading of the power grid | Approved |
Ba Vi Electricity | From 07:15 to 13:00 | Part of customers are from Vat Lai, Dong Thai, Phu Dong communes. | Serving the renovation and upgrading of the power grid | Approved |
Ba Vi Electricity | From 07:15 to 13:00 | Part of customers are from Vat Lai, Dong Thai, Phu Dong communes. | Serving the renovation and upgrading of the power grid | Approved |
Ba Vi Electricity | From 07:00 to 10:30 | Part of customers are from Phu Cuong commune (Thanh Chieu village), Tan Hong commune (La Thuong village, La Pham 1, 2) | Serving the renovation and upgrading of the power grid | Approved |
Ba Vi Electricity | From 07:00 to 10:30 | Part of customers are from Phu Cuong commune (Thanh Chieu village), Tan Hong commune (La Thuong village, La Pham 1, 2) | Serving the renovation and upgrading of the power grid | Approved |
Ba Vi Electricity | From 07:15 to 13:00 | Part of customers are from Vat Lai, Dong Thai, Phu Dong communes. | Serving the renovation and upgrading of the power grid | Approved |
Ba Vi Electricity | From 07:00 to 10:30 | Part of customers are from Phu Cuong commune (Thanh Chieu village), Tan Hong commune (La Thuong village, La Pham 1, 2) | Serving the renovation and upgrading of the power grid | Approved |
Ba Vi Electricity | From 07:15 to 13:00 | Part of customers are from Vat Lai, Dong Thai, Phu Dong communes. | Serving the renovation and upgrading of the power grid | Approved |
Dan Phuong Electricity | From 07:30 to 10:00 | Part of Tan Hoi commune | Serving the renovation and upgrading of the power grid | Approved |
Dan Phuong Electricity | From 08:00 to 10:30 | Part of Dong Thap commune | Serving the renovation and upgrading of the power grid | Approved |
Dan Phuong Electricity | From 08:00 to 10:00 | Part of Phuong Dinh commune | Serving the renovation and upgrading of the power grid | Approved |
Dan Phuong Electricity | From 08:00 to 10:30 | Part of Dong Thap commune | Serving the renovation and upgrading of the power grid | Approved |
Dan Phuong Electricity | From 08:00 to 10:00 | Part of Phuong Dinh commune | Serving the renovation and upgrading of the power grid | Approved |
Dan Phuong Electricity | From 07:30 to 10:00 | Part of Tan Hoi commune | Serving the renovation and upgrading of the power grid | Approved |
Dan Phuong Electricity | From 08:00 to 10:30 | Part of Dong Thap commune | Serving the renovation and upgrading of the power grid | Approved |
Thach That Electricity | From 06:30 to 10:30 | Phung Xa Commune, Binh Phu Industrial Park | Serving the renovation and upgrading of the power grid | Approved |
Thach That Electricity | From 07:30 to 12:30 | Thach Hoa Commune | Serving the renovation and upgrading of the power grid | Approved |
Thach That Electricity | From 08:30 to 15:00 | Vietnam National Museum of Ethnic Groups | Serving the renovation and upgrading of the power grid | Approved |
Thach That Electricity | From 08:30 to 15:00 | Vietnam National Museum of Ethnic Groups | Serving the renovation and upgrading of the power grid | Approved |
Thach That Electricity | From 07:30 to 12:30 | Thach Hoa Commune | Serving the renovation and upgrading of the power grid | Approved |
Thach That Electricity | From 06:30 to 10:30 | Phung Xa Commune, Binh Phu Industrial Park | Serving the renovation and upgrading of the power grid | Approved |
Thach That Electricity | From 06:30 to 10:30 | Phung Xa Commune, Binh Phu Industrial Park | Serving the renovation and upgrading of the power grid | Approved |
Thach That Electricity | From 07:30 to 12:30 | Thach Hoa Commune | Serving the renovation and upgrading of the power grid | Approved |
Thach That Electricity | From 07:30 to 12:30 | Thach Hoa Commune | Serving the renovation and upgrading of the power grid | Approved |
Quoc Oai Electricity | From 13:30 to 17:00 | No information yet | Serving the renovation and upgrading of the power grid | Approved |
Quoc Oai Electricity | From 07:30 to 12:00 | No information yet | Serving the renovation and upgrading of the power grid | Approved |
My Duc Electricity | From 07:00 to 15:00 | Part of Tran Phu commune, Me Ga Company, Thanh Lap Joint Stock Company, Unit 897 of the Ministry of National Defense, Thong Nhat Limited Liability Company, Thinh Long International Trading Joint Stock Company and Battalion 29 - Brigade 28. | Serving the renovation and upgrading of the power grid | Approved |
Ung Hoa Power | From 08:00 to 09:30 | Part of Van Dinh town | Serving the renovation and upgrading of the power grid | Approved |
Ung Hoa Power | From 09:30 to 14:30 | Part of Van Dinh town | Serving the renovation and upgrading of the power grid | Approved |
Ung Hoa Power | From 14:30 to 16:00 | Part of Van Dinh town | Serving the renovation and upgrading of the power grid | Approved |
Ung Hoa Power | From 08:00 to 09:30 | Part of Van Dinh town | Serving the renovation and upgrading of the power grid | Approved |
Ung Hoa Power | From 09:30 to 14:30 | Part of Van Dinh town | Serving the renovation and upgrading of the power grid | Approved |
Ung Hoa Power | From 14:30 to 16:00 | Part of Van Dinh town | Serving the renovation and upgrading of the power grid | Approved |
Ung Hoa Power | From 07:30 to 15:30 | Part of Phuong Tu commune | Serving the renovation and upgrading of the power grid | Approved |
Ung Hoa Power | From 08:00 to 09:30 | Part of Van Dinh town | Serving the renovation and upgrading of the power grid | Approved |
Ung Hoa Power | From 09:30 to 14:30 | Part of Van Dinh town | Serving the renovation and upgrading of the power grid | Approved |
Ung Hoa Power | From 14:30 to 16:00 | Part of Van Dinh town | Serving the renovation and upgrading of the power grid | Approved |
Ung Hoa Power | From 07:30 to 15:30 | Part of Hoa Lam commune, Dong Tan commune | Serving the renovation and upgrading of the power grid | Approved |
Ung Hoa Power | From 07:30 to 15:30 | Part of Hoa Lam commune, Dong Tan commune | Serving the renovation and upgrading of the power grid | Approved |
Ung Hoa Power | From 07:30 to 15:30 | Part of Hoa Lam commune, Dong Tan commune | Serving the renovation and upgrading of the power grid | Approved |
Phu Xuyen Electricity | From 08:00 to 16:00 | From after the ATM to the end of the 0.4kV Lat Duong substation | Serving the renovation and upgrading of the power grid | Approved |
Phu Xuyen Electricity | From 08:00 to 16:00 | From after the ATM to the end of the 0.4kV Lat Duong substation | Serving the renovation and upgrading of the power grid | Approved |
Phu Xuyen Electricity | From 08:00 to 16:00 | From after the ATM to the end of the 0.4kV Lat Duong substation | Serving the renovation and upgrading of the power grid | Approved |
Phu Xuyen Electricity | From 08:00 to 16:00 | From after the ATM to the end of the 0.4kV Lat Duong substation | Serving the renovation and upgrading of the power grid | Approved |
My Duc Electricity | From 07:00 to 15:00 | Part of Tran Phu commune, Me Ga Company, Thanh Lap Joint Stock Company, Unit 897 of the Ministry of National Defense, Thong Nhat Limited Liability Company, Thinh Long International Trading Joint Stock Company and Battalion 29 - Brigade 28. | Serving the renovation and upgrading of the power grid | Approved |
My Duc Electricity | From 07:00 to 15:00 | Part of Tran Phu commune, Me Ga Company, Thanh Lap Joint Stock Company, Unit 897 of the Ministry of National Defense, Thong Nhat Limited Liability Company, Thinh Long International Trading Joint Stock Company and Battalion 29 - Brigade 28. | Serving the renovation and upgrading of the power grid | Approved |
Thanh Oai Electricity | From 06:30 to 07:30 | Chau Mai Village | Serving the renovation and upgrading of the power grid | Approved |
Thanh Oai Electricity | From 07:30 to 15:30 | Chau Mai Village | Serving the renovation and upgrading of the power grid | Approved |
Thanh Oai Electricity | From 13:00 to 15:00 | Ngo Dong Village | Serving the renovation and upgrading of the power grid | Approved |
Thanh Oai Electricity | From 06:30 to 07:30 | Chau Mai Village | Serving the renovation and upgrading of the power grid | Approved |
Thanh Oai Electricity | From 07:00 to 15:00 | Ngo Dong Village | Serving the renovation and upgrading of the power grid | Approved |
Thanh Oai Electricity | From 07:30 to 15:30 | Chau Mai Village | Serving the renovation and upgrading of the power grid | Approved |
Thanh Oai Electricity | From 13:00 to 15:00 | Ngo Dong Village | Serving the renovation and upgrading of the power grid | Approved |
Thanh Oai Electricity | From 06:30 to 07:30 | Chau Mai Village | Serving the renovation and upgrading of the power grid | Approved |
Thanh Oai Electricity | From 07:30 to 15:30 | Chau Mai Village | Serving the renovation and upgrading of the power grid | Approved |
Thanh Oai Electricity | From 06:30 to 07:30 | Chau Mai Village | Serving the renovation and upgrading of the power grid | Approved |
Thanh Oai Electricity | From 07:30 to 15:30 | Chau Mai Village | Serving the renovation and upgrading of the power grid | Approved |
Thanh Oai Electricity | From 07:30 to 15:30 | Chau Mai Village | Serving the renovation and upgrading of the power grid | Approved |
Thanh Oai Electricity | From 13:00 to 15:00 | Ngo Dong Village | Serving the renovation and upgrading of the power grid | Approved |
Thanh Oai Electricity | From 06:30 to 07:30 | Chau Mai Village | Serving the renovation and upgrading of the power grid | Approved |
Thanh Oai Electricity | From 07:30 to 15:30 | Chau Mai Village | Serving the renovation and upgrading of the power grid | Approved |
Thanh Oai Electricity | From 13:00 to 15:00 | Ngo Dong Village | Serving the renovation and upgrading of the power grid | Approved |
Thanh Oai Electricity | From 07:30 to 15:30 | Chau Mai Village | Serving the renovation and upgrading of the power grid | Approved |
Thanh Oai Electricity | From 13:00 to 15:00 | Ngo Dong Village | Serving the renovation and upgrading of the power grid | Approved |
Thanh Oai Electricity | From 06:30 to 07:30 | Chau Mai Village | Serving the renovation and upgrading of the power grid | Approved |
Thanh Oai Electricity | From 07:00 to 15:00 | Ngo Dong Village | Serving the renovation and upgrading of the power grid | Approved |
Thanh Oai Electricity | From 07:30 to 15:30 | Chau Mai Village | Serving the renovation and upgrading of the power grid | Approved |
Thanh Oai Electricity | From 13:00 to 15:00 | Ngo Dong Village | Serving the renovation and upgrading of the power grid | Approved |
Thuong Tin Electricity | From 06:00 to 07:30 | Nghiem Xuyen Commune, Dung Tien | Serving the renovation and upgrading of the power grid | Approved |
Thuong Tin Electricity | From 07:30 to 15:30 | Nghiem Xuyen Commune, Dung Tien | Serving the renovation and upgrading of the power grid | Approved |
Thuong Tin Electricity | From 07:30 to 15:30 | Nghiem Xuyen Commune | Serving the renovation and upgrading of the power grid | Approved |
Thuong Tin Electricity | From 07:30 to 15:30 | Nghiem Xuyen Commune | Serving the renovation and upgrading of the power grid | Approved |
Thuong Tin Electricity | From 06:00 to 07:30 | Nghiem Xuyen Commune, Dung Tien | Serving the renovation and upgrading of the power grid | Approved |
Thuong Tin Electricity | From 07:30 to 15:30 | Nghiem Xuyen Commune, Dung Tien | Serving the renovation and upgrading of the power grid | Approved |
Thuong Tin Electricity | From 06:00 to 07:30 | Nghiem Xuyen Commune, Dung Tien | Serving the renovation and upgrading of the power grid | Approved |
Me Linh Power | From 06:30 to 16:30 | Part of Tien Phong commune | Serving the renovation and upgrading of the power grid | Approved |
Me Linh Power | From 06:30 to 16:30 | Part of Tien Phong commune | Serving the renovation and upgrading of the power grid | Postpone |
Thuong Tin Electricity | From 07:30 to 15:30 | Nghiem Xuyen Commune | Serving the renovation and upgrading of the power grid | Approved |
Soc Son Power | From 06:30 to 12:30 | Part of Tan Minh commune | Serving the renovation and upgrading of the power grid | Approved |
Thuong Tin Electricity | From 06:00 to 07:30 | Nghiem Xuyen Commune, Dung Tien | Serving the renovation and upgrading of the power grid | Approved |
Thuong Tin Electricity | From 07:30 to 15:30 | Nghiem Xuyen Commune, Dung Tien | Serving the renovation and upgrading of the power grid | Approved |
Thuong Tin Electricity | From 07:30 to 15:30 | Nghiem Xuyen Commune | Serving the renovation and upgrading of the power grid | Approved |
Thuong Tin Electricity | From 07:30 to 15:30 | Nghiem Xuyen Commune | Serving the renovation and upgrading of the power grid | Approved |
My Duc Electricity | From 07:00 to 15:00 | Part of Tran Phu commune, Me Ga Company, Thanh Lap Joint Stock Company, Unit 897 of the Ministry of National Defense, Thong Nhat Limited Liability Company, Thinh Long International Trading Joint Stock Company and Battalion 29 - Brigade 28. | Serving the renovation and upgrading of the power grid | Approved |
My Duc Electricity | From 07:00 to 15:00 | Part of Tran Phu commune, Me Ga Company, Thanh Lap Joint Stock Company, Unit 897 of the Ministry of National Defense, Thong Nhat Limited Liability Company, Thinh Long International Trading Joint Stock Company and Battalion 29 - Brigade 28. | Serving the renovation and upgrading of the power grid | Approved |
My Duc Electricity | From 07:00 to 12:00 | Part of Ha Quat village, Hop Tien commune | Serving the renovation and upgrading of the power grid | Approved |
My Duc Electricity | From 07:00 to 12:00 | Part of Ha Quat village, Hop Tien commune | Serving the renovation and upgrading of the power grid | Approved |
Ung Hoa Power | From 07:30 to 15:30 | Part of Hoa Lam commune, Dong Tan commune | Serving the renovation and upgrading of the power grid | Approved |
Ung Hoa Power | From 07:30 to 15:30 | Part of Phuong Tu commune | Serving the renovation and upgrading of the power grid | Approved |
Ung Hoa Power | From 08:00 to 09:30 | Part of Van Dinh town | Serving the renovation and upgrading of the power grid | Approved |
Ung Hoa Power | From 09:30 to 14:30 | Part of Van Dinh town | Serving the renovation and upgrading of the power grid | Approved |
Ung Hoa Power | From 14:30 to 16:00 | Part of Van Dinh town | Serving the renovation and upgrading of the power grid | Approved |
Ung Hoa Power | From 08:00 to 09:30 | Part of Van Dinh town | Serving the renovation and upgrading of the power grid | Approved |
Ung Hoa Power | From 09:30 to 14:30 | Part of Van Dinh town | Serving the renovation and upgrading of the power grid | Approved |
Ung Hoa Power | From 14:30 to 16:00 | Part of Van Dinh town | Serving the renovation and upgrading of the power grid | Approved |
Ung Hoa Power | From 08:00 to 09:30 | Part of Van Dinh town | Serving the renovation and upgrading of the power grid | Approved |
Ung Hoa Power | From 09:30 to 14:30 | Part of Van Dinh town | Serving the renovation and upgrading of the power grid | Approved |
Ung Hoa Power | From 14:30 to 16:00 | Part of Van Dinh town | Serving the renovation and upgrading of the power grid | Approved |
Ung Hoa Power | From 08:00 to 09:30 | Part of Van Dinh town | Serving the renovation and upgrading of the power grid | Approved |
Ung Hoa Power | From 09:30 to 14:30 | Part of Van Dinh town | Serving the renovation and upgrading of the power grid | Approved |
Ung Hoa Power | From 14:30 to 16:00 | Part of Van Dinh town | Serving the renovation and upgrading of the power grid | Approved |
Me Linh Power | From 07:00 to 12:00 | Part of Lien Mac commune | Serving the renovation and upgrading of the power grid | Approved |
Me Linh Power | From 07:30 to 13:30 | Part of Thach Da commune | Serving the renovation and upgrading of the power grid | Approved |
Me Linh Power | From 06:30 to 16:30 | Part of Tien Phong commune | Serving the renovation and upgrading of the power grid | Approved |
Me Linh Power | From 06:30 to 16:30 | Part of Tien Phong commune | Serving the renovation and upgrading of the power grid | Postpone |
Me Linh Power | From 06:30 to 16:30 | Part of Tien Phong commune | Serving the renovation and upgrading of the power grid | Approved |
Me Linh Power | From 06:30 to 16:30 | Part of Tien Phong commune | Serving the renovation and upgrading of the power grid | Postpone |
Me Linh Power | From 07:00 to 12:00 | Part of Lien Mac commune | Serving the renovation and upgrading of the power grid | Approved |
Me Linh Power | From 07:30 to 13:30 | Part of Thach Da commune | Serving the renovation and upgrading of the power grid | Approved |
Me Linh Power | From 06:30 to 16:30 | Part of Tien Phong commune | Serving the renovation and upgrading of the power grid | Approved |
Me Linh Power | From 06:30 to 16:30 | Part of Tien Phong commune | Serving the renovation and upgrading of the power grid | Postpone |
Me Linh Power | From 06:30 to 16:30 | Part of Tien Phong commune | Serving the renovation and upgrading of the power grid | Approved |
Me Linh Power | From 06:30 to 16:30 | Part of Tien Phong commune | Serving the renovation and upgrading of the power grid | Postpone |
Me Linh Power | From 07:00 to 11:00 | Part of Tien Phong commune | Serving the renovation and upgrading of the power grid | Approved |
Me Linh Power | From 07:30 to 13:30 | Part of Thach Da commune | Serving the renovation and upgrading of the power grid | Approved |
Me Linh Power | From 06:30 to 16:30 | Part of Tien Phong commune | Serving the renovation and upgrading of the power grid | Approved |
Me Linh Power | From 06:30 to 16:30 | Part of Tien Phong commune | Serving the renovation and upgrading of the power grid | Approved |
Me Linh Power | From 06:30 to 16:30 | Part of Tien Phong commune | Serving the renovation and upgrading of the power grid | Postpone |
Me Linh Power | From 07:00 to 12:00 | Part of Lien Mac commune | Serving the renovation and upgrading of the power grid | Approved |
Me Linh Power | From 07:00 to 11:00 | Part of Tien Phong commune | Serving the renovation and upgrading of the power grid | Approved |
Me Linh Power | From 07:30 to 13:30 | Part of Thach Da commune | Serving the renovation and upgrading of the power grid | Approved |
Me Linh Power | From 06:30 to 16:30 | Part of Tien Phong commune | Serving the renovation and upgrading of the power grid | Approved |
Me Linh Power | From 06:30 to 16:30 | Part of Tien Phong commune | Serving the renovation and upgrading of the power grid | Postpone |
Me Linh Power | From 07:00 to 11:00 | Part of Tien Phong commune | Serving the renovation and upgrading of the power grid | Approved |
Me Linh Power | From 06:30 to 16:30 | Part of Tien Phong commune | Serving the renovation and upgrading of the power grid | Approved |
Me Linh Power | From 06:30 to 16:30 | Part of Tien Phong commune | Serving the renovation and upgrading of the power grid | Postpone |
Me Linh Power | From 07:00 to 12:00 | Part of Lien Mac commune | Serving the renovation and upgrading of the power grid | Approved |
Me Linh Power | From 07:30 to 13:30 | Part of Thach Da commune | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 06:00 to 14:00 | Urban Lighting and Equipment Company Limited | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 06:00 to 14:00 | TT1, BT3, 4 Van Phu Urban Area | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 14:00 to 17:00 | Along Nhue Giang street (from Cau Trang to Cau Den); Financial center; Bui Bang Doan street | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 09:00 to 12:00 | Part of residential group 15, Dong Mai ward | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 14:00 to 16:00 | House numbers 1 to 107 Be Van Dan Street, Quang Trung Street from number 12 to 78 | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 06:00 to 14:00 | TT1, BT3, 4 Van Phu Urban Area | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 08:00 to 10:00 | Part of residential group Ha Tri 1, 3, lane 8 Ha Tri 1. | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 14:00 to 17:00 | Along Nhue Giang street (from Cau Trang to Cau Den); Financial center; Bui Bang Doan street | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 14:00 to 17:00 | Xa La Residential Area – Phuc La Ward | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 14:00 to 17:00 | Technology Center, Residential Group 2, 3, Van Quan Ward | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 14:00 to 16:00 | CT2 Ha Cau Apartment | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 06:30 to 07:30 | Hanoi Motor Vehicle Inspection Center, Toyota Ha Dong Company Limited | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 07:00 to 10:00 | Part of residential group 1, 2, Yen Nghia ward | Serving the renovation and upgrading of the power grid | Approved |
Ha Dong Electricity | From 11:30 to 12:30 | Hanoi Motor Vehicle Inspection Center, Toyota Ha Dong Company Limited | Serving the renovation and upgrading of the power grid | Approved |
Nam Tu Liem Electricity | From 05:00 to 09:00 | Part of Residential Group No. 11 - Trung Van Ward - Nam Tu Liem District - Hanoi | Serving the renovation and upgrading of the power grid | Approved |
Nam Tu Liem Electricity | From 08:00 to 16:00 | . Click to download Building A, Golden Palace, Me Tri ward, Nam Tu Liem district, Hanoi city | Serving the renovation and upgrading of the power grid | Approved |
Nam Tu Liem Electricity | From 14:00 to 17:00 | Load of TBA T1 Street light, Pham Hung street, My Dinh 1 ward, Nam Tu Liem district, Hanoi city | Serving the renovation and upgrading of the power grid | Approved |
Nam Tu Liem Electricity | From 05:00 to 09:00 | Part of Residential Group No. 11 - Trung Van Ward - Nam Tu Liem District - Hanoi | Serving the renovation and upgrading of the power grid | Approved |
Nam Tu Liem Electricity | From 07:00 to 16:00 | Part of Residential Group No. 11 - My Dinh 1 Ward - Nam Tu Liem District - Hanoi | Serving the renovation and upgrading of the power grid | Approved |
Nam Tu Liem Electricity | From 08:00 to 16:00 | . Click to download Building A, Golden Palace, Me Tri ward, Nam Tu Liem district, Hanoi city | Serving the renovation and upgrading of the power grid | Approved |
Nam Tu Liem Electricity | From 00:00 to 08:00 | All loads after the Water Sports Substation, My Dinh 1 Ward, Nam Tu Liem District, Hanoi City. | Serving the renovation and upgrading of the power grid | Approved |
Nam Tu Liem Electricity | From 08:00 to 17:00 | Water Pumping Station - Residential Group No. 3 - Phu Do Ward - Nam Tu Liem District - Hanoi | Serving the renovation and upgrading of the power grid | Approved |
Nam Tu Liem Electricity | From 14:00 to 17:00 | Load of TBA T1 Street light, Pham Hung street, My Dinh 1 ward, Nam Tu Liem district, Hanoi city | Serving the renovation and upgrading of the power grid | Approved |
Above is the power outage schedule for areas in Hanoi on December 27, 2024. Currently, there is no information about power outages in some other locations. Nghe An Newspaper will regularly update the latest and most accurate information about the power outage schedule in Hanoi for readers to follow.
Instructions for looking up power outage schedule in Hanoi
There are many ways to look up power outage schedules, including the following:
Follow Hanoi power outage schedule at Nghe An newspaper
Nghe An Newspaper will regularly update the latest and accurate information about power outage schedule in Hanoi for readers' convenience.
Look up power outage schedule on EVN Hanoi website
To look up the power outage schedule in Hanoi today and the coming days, everyone can access the EVN Hanoi website at the linkhttps://evnhanoi.vn/search/power-cut. Select itemDistrict -> Ward -> From date, To dateto capture information

Search on EVN Customer Service application
Everyone downloads the EVN Customer Service application to their phone and registers for an account. Next, select the “Power outage schedule” section to see the exact Hanoi power outage schedule right on your phone.