(Baonghean.vn) - With the strong participation of both the government and the people, the clearance of the traffic corridor in the border commune of Tam Quang (Tuong Duong) was basically completed.
 |
Tam Quang is a border commune with a large natural area, however, the population is mainly concentrated on the main roads, so clearing the traffic corridor in this locality is quite difficult. Photo: Ho Phuong |
 |
Since mid-2016, the Tam Quang commune government has organized many campaigns to clear the traffic corridor, restoring the main roads. In particular, during the peak period from July to August, the locality even used excavators to level the ground when people proactively removed objects encroaching on the traffic corridor. Photo: Ho Phuong |
 |
Local authorities poured concrete on traffic corridors on some main roads, creating wide and beautiful roads. Photo: Ho Phuong |
 |
People discuss contributing to building roads. Photo: Ho Phuong |
 |
Hundreds of meters of road in the border commune of Tam Quang have been cleared. Photo: Ho Phuong |
 |
Some households with tall houses have proactively built hidden stairs to bring vehicles into their homes. Photo: Ho Phuong |
 |
Many people built, installed, and re-enclosed the embankment and road for their families after clearing the corridor. Photo: Ho Phuong |
 |
National Highway 7, the section running through Tam Quang Commune, is now wide open. People travel more safely and bus and truck drivers have better visibility and are able to move more easily. Photo: Ho Phuong |
Ho Phuong