According to Hanoi Electricity, there is a scheduled power outage in districts in Hanoi on December 11, 2024.
The latest information on power outage schedule in Hanoi on Sunday, December 11, 2024 is updated from the Hanoi Electricity portal.
There can be many reasons for power outages in Hanoi. Factors that can cause power outages include natural disasters, floods, storms, or the management unit carrying out repairs and maintenance of power grid lines.

This is the power outage schedule in the plan of the power companies. Depending on the weather situation, the plan of the power units... the power outage schedule can be adjusted and postponed in some places.
Hanoi power outage schedule on December 11, 2024
Time:From 06:45 to 09:15
Area:Part of Phu Linh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 08:45 to 11:15
Area:Part of Phu Linh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 06:45 to 09:15
Area:Part of Phu Linh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Dong Anh Electricity Company
Time:From 05:30 to 15:30
Area:Part of Thuy Lam commune, Xuan Non
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Dong Anh Electricity Company
Time:From 05:30 to 15:30
Area:Part of Thuy Lam commune, Xuan Non
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Dong Anh Electricity Company
Time:From 05:30 to 15:30
Area:Part of Thuy Lam commune, Xuan Non
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Dong Anh Electricity Company
Time:From 05:30 to 15:30
Area:Part of Thuy Lam commune, Xuan Non
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Dong Anh Electricity Company
Time:From 05:30 to 15:30
Area:Part of Thuy Lam commune, Xuan Non
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Dong Anh Electricity Company
Time:From 05:30 to 15:30
Area:Part of Thuy Lam commune, Xuan Non
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Dong Anh Electricity Company
Time:From 05:30 to 15:30
Area:Part of Thuy Lam commune, Xuan Non
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Long Bien Power Company
Time:From 08:00 to 15:30
Area:Customer Vu Xuan Thieu Street, part of Phuc Loi Ward; May 10
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Gia Lam Power Company
Time:From 07:00 to 14:00
Area:Part of Bat Trang commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Gia Lam Power Company
Time:From 10:00 to 11:45
Area:Kevin Vietnam Electric Cable Company Limited
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Long Bien Power Company
Time:From 08:00 to 15:30
Area:Customer Vu Xuan Thieu Street, part of Phuc Loi Ward; May 10
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Gia Lam Power Company
Time:From 07:00 to 14:00
Area:Part of Bat Trang commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Gia Lam Power Company
Time:From 09:00 to 11:00
Area:Quoc Huy Import Export Production and Trading Company Limited
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Gia Lam Power Company
Time:From 09:30 to 11:00
Area:Duc Anh Adhesive Joint Stock Company
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Long Bien Power Company
Time:From 08:00 to 15:30
Area:Customer Vu Xuan Thieu Street, part of Phuc Loi Ward; May 10
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Gia Lam Power Company
Time:From 07:00 to 14:00
Area:Part of Bat Trang commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Long Bien Power Company
Time:From 08:00 to 15:30
Area:Customer Vu Xuan Thieu Street, part of Phuc Loi Ward; May 10
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Long Bien Power Company
Time:From 08:00 to 15:30
Area:Customer Vu Xuan Thieu Street, part of Phuc Loi Ward; May 10
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Gia Lam Power Company
Time:From 14:00 to 16:00
Area:10-10 Textile Joint Stock Company
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Gia Lam Power Company
Time:From 07:00 to 14:00
Area:Part of Trau Quy Center
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Gia Lam Power Company
Time:From 08:00 to 10:00
Area:76 One Member LLC
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Long Bien Power Company
Time:From 08:00 to 15:30
Area:Customer Vu Xuan Thieu Street, part of Phuc Loi Ward; May 10
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 08:00 to 11:30
Area:MBA TH Viet Duc
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Long Bien Power Company
Time:From 08:00 to 15:30
Area:Customer Vu Xuan Thieu Street, part of Phuc Loi Ward; May 10
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Long Bien Power Company
Time:From 08:00 to 15:30
Area:Customer Vu Xuan Thieu Street, part of Phuc Loi Ward; May 10
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Long Bien Power Company
Time:From 08:00 to 15:30
Area:Customer Vu Xuan Thieu Street, part of Phuc Loi Ward; May 10
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 07:00 to 11:00
Area:MBA1, MBA2 Dinh Cong 15
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 08:00 to 16:00
Area:Part of Dai Kim ward, Hoang Mai district
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 13:30 to 16:30
Area:Part of Dai Kim
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoan Kiem Electricity Company
Time:From 05:00 to 08:00
Area:No. 21 and 22, from No. 3 to No. 11, From No. 4 to No. 16 Ha Hoi; From No. 58 to No. 62, From No. 71 to No. 75, 66 Tran Hung Dao; 23 and 25 Quang Trung; 86 Bong Nhuom
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoan Kiem Electricity Company
Time:From 08:00 to 11:00
Area:From number 66 to number 72, From number 77 to number 81 Tran Hung Dao
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoan Kiem Electricity Company
Time:From 05:00 to 08:00
Area:No. 21 and 22, from No. 3 to No. 11, From No. 4 to No. 16 Ha Hoi; From No. 58 to No. 62, From No. 71 to No. 75, 66 Tran Hung Dao; 23 and 25 Quang Trung; 86 Bong Nhuom
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoan Kiem Electricity Company
Time:From 08:00 to 11:00
Area:From number 66 to number 72, From number 77 to number 81 Tran Hung Dao
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoan Kiem Electricity Company
Time:From 12:30 to 15:30
Area:From No. 44 to No. 58 Ba Trieu Street, No. 92 and from No. 87 to No. 91 Tho Nhuom Street, No. 54A and 54B Tran Hung Dao Street
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoan Kiem Electricity Company
Time:From 15:30 to 18:30
Area:From No. 5 to No. 19 Ha Hoi Street; from No. 28 to No. 36 Quang Trung Street; from No. 2 to No. 48, from No. 1 to No. 37 Lien Tri Street; from No. 58 to No. 76 Tran Quoc Toan Street
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoan Kiem Electricity Company
Time:From 12:30 to 15:30
Area:From No. 44 to No. 58 Ba Trieu Street, No. 92 and from No. 87 to No. 91 Tho Nhuom Street, No. 54A and 54B Tran Hung Dao Street
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoan Kiem Electricity Company
Time:From 15:30 to 18:30
Area:From No. 5 to No. 19 Ha Hoi Street; from No. 28 to No. 36 Quang Trung Street; from No. 2 to No. 48, from No. 1 to No. 37 Lien Tri Street; from No. 58 to No. 76 Tran Quoc Toan Street
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Dong Da Electricity Company
Time:From 07:00 to 12:00
Area:Group 49 Phuong Lien
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Dong Da Electricity Company
Time:From 07:00 to 12:00
Area:Group 49 Phuong Lien
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Cau Giay Power Company
Time:From 08:30 to 09:30
Area:Alley 68 Xuan Thuy Street, Alley 81, 87 Nguyen Phong Sac, Dich Vong Hau Ward - CG - HN
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Cau Giay Power Company
Time:From 10:45 to 11:45
Area:House A5, B5 Thang Long International Village - Dich Vong - CG - HN
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Cau Giay Power Company
Time:From 08:30 to 09:30
Area:Alley 68 Xuan Thuy Street, Alley 81, 87 Nguyen Phong Sac, Dich Vong Hau Ward - CG - HN
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Cau Giay Power Company
Time:From 08:30 to 09:30
Area:Alley 68 Xuan Thuy Street, Alley 81, 87 Nguyen Phong Sac, Dich Vong Hau Ward - CG - HN
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Cau Giay Power Company
Time:From 10:45 to 11:45
Area:House A5, B5 Thang Long International Village - Dich Vong - CG - HN
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Cau Giay Power Company
Time:From 08:30 to 09:30
Area:Alley 68 Xuan Thuy Street, Alley 81, 87 Nguyen Phong Sac, Dich Vong Hau Ward - CG - HN
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Cau Giay Power Company
Time:From 08:30 to 09:30
Area:Alley 68 Xuan Thuy Street, Alley 81, 87 Nguyen Phong Sac, Dich Vong Hau Ward - CG - HN
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Cau Giay Power Company
Time:From 10:45 to 11:45
Area:House A5, B5 Thang Long International Village - Dich Vong - CG - HN
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 07:30 to 08:45
Area:Part of Minh Phu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 08:30 to 09:45
Area:Part of Minh Phu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 09:30 to 10:45
Area:Part of Minh Phu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 10:30 to 11:45
Area:Part of Minh Tri commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 15:30 to 16:45
Area:Part of Hong Ky commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 07:30 to 08:45
Area:Part of Minh Phu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 08:30 to 09:45
Area:Part of Minh Phu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 08:30 to 09:45
Area:Part of Bac Son commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 08:45 to 11:15
Area:Part of Phu Linh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 09:30 to 10:45
Area:Part of Minh Phu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 10:30 to 11:45
Area:Part of Nam Son commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 10:30 to 11:45
Area:Part of Minh Tri commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 15:30 to 16:45
Area:Part of Hong Ky commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 10:30 to 11:45
Area:Part of Minh Tri commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 10:30 to 11:45
Area:Part of Minh Tri commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 07:30 to 11:30
Area:MBA1, MBA2 Dinh Cong 7
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 14:00 to 17:00
Area:Part of Dai Kim
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 07:00 to 11:00
Area:MBA1, MBA2 Dinh Cong 15
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 07:30 to 11:30
Area:MBA1, MBA2 Dinh Cong 7
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 08:00 to 11:30
Area:MBA TH Viet Duc
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 08:00 to 16:00
Area:Part of Dai Kim ward, Hoang Mai district
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 13:00 to 16:00
Area:Part of Dai Kim
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 13:30 to 16:30
Area:Part of Dai Kim
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 13:00 to 16:00
Area:Part of Dai Kim
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 13:30 to 16:30
Area:Part of Dai Kim
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 14:00 to 17:00
Area:Part of Dai Kim
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 07:30 to 11:30
Area:MBA1, MBA2 Dinh Cong 7
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 08:00 to 11:30
Area:MBA TH Viet Duc
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 08:00 to 16:00
Area:Part of Dai Kim ward, Hoang Mai district
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 13:00 to 16:00
Area:Part of Dai Kim
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 13:30 to 16:30
Area:Part of Dai Kim
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 14:00 to 17:00
Area:Part of Dai Kim
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 08:00 to 11:30
Area:MBA TH Viet Duc
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 13:30 to 16:30
Area:Part of Dai Kim
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 07:30 to 11:30
Area:MBA1, MBA2 Dinh Cong 7
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 08:00 to 11:30
Area:MBA TH Viet Duc
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 08:00 to 16:00
Area:Part of Dai Kim ward, Hoang Mai district
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 14:00 to 17:00
Area:Part of Dai Kim
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 07:30 to 11:30
Area:MBA1, MBA2 Dinh Cong 7
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 08:00 to 11:30
Area:MBA TH Viet Duc
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 13:00 to 16:00
Area:Part of Dai Kim
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 08:00 to 16:00
Area:Part of Giap Tu
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 08:00 to 16:00
Area:Part of Dai Kim ward, Hoang Mai district
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 07:00 to 11:00
Area:MBA1, MBA2 Dinh Cong 15
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 08:00 to 11:30
Area:MBA TH Viet Duc
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 08:00 to 16:00
Area:Part of Dai Kim ward, Hoang Mai district
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoang Mai Power Company
Time:From 14:00 to 17:00
Area:Part of Dai Kim
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 07:30 to 08:45
Area:Part of Minh Phu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 08:30 to 09:45
Area:Part of Minh Phu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 10:30 to 11:45
Area:Part of Minh Tri commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 07:30 to 08:45
Area:Part of Minh Phu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 08:30 to 09:45
Area:Part of Minh Phu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 09:30 to 10:45
Area:Part of Minh Phu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 10:30 to 11:45
Area:Part of Minh Tri commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 14:30 to 15:45
Area:Part of Hien Ninh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 13:30 to 14:45
Area:Part of Hien Ninh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 14:30 to 15:45
Area:Part of Hien Ninh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 14:30 to 15:45
Area:Part of Hien Ninh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 07:30 to 08:45
Area:Part of Minh Phu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 09:30 to 10:45
Area:Part of Minh Phu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 14:30 to 15:45
Area:Part of Hong Ky commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 10:30 to 11:45
Area:Part of Nam Son commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 14:30 to 15:45
Area:Part of Hien Ninh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 07:30 to 08:45
Area:Part of Bac Son commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 08:30 to 09:45
Area:Part of Bac Son commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 09:30 to 10:45
Area:Part of Bac Son commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 07:30 to 08:45
Area:Part of Bac Son commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 14:30 to 15:45
Area:Part of Hong Ky commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Soc Son Power Company
Time:From 15:30 to 16:45
Area:Part of Hong Ky commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 08:00 to 12:00
Area:Part of residential group 6, Phu Luong ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 08:00 to 12:00
Area:Part of residential group 6, Phu Luong ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 08:00 to 12:00
Area:Part of residential group 11, 12, Phu Luong ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 08:00 to 12:00
Area:part of residential group 8,9 Dong Mai ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 14:00 to 17:00
Area:part of residential group 15,16 Dong Mai ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 14:00 to 17:00
Area:Part of residential group 11, 12, Phu Luong ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 06:00 to 11:00
Area:Vietnam International Urban Development Joint Stock Company, Doan Ket Residential Group, Thang Loi, Duong Noi Ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Son Tay Power Company
Time:From 07:00 to 15:00
Area:Van Khe village, part of Nhan Ly village - Xuan Son commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Son Tay Power Company
Time:From 07:00 to 12:00
Area:Part of Nhan Ly village, Van Khe village - Xuan Son commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
----------------------------------
Electricity:Son Tay Power Company
Time:From 07:00 to 15:00
Area:Part of Tran Hung Dao street, part of Chua Moi area
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Son Tay Power Company
Time:From 08:00 to 12:00
Area:Part of Quang Trung Street, Nghia Phu Embankment Area, part of Cau Tri Street
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Son Tay Power Company
Time:From 07:00 to 15:00
Area:Van Khe village, part of Nhan Ly village - Xuan Son commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Son Tay Power Company
Time:From 07:00 to 12:00
Area:Part of Nhan Ly village, Van Khe village - Xuan Son commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
----------------------------------
Electricity:Son Tay Power Company
Time:From 07:00 to 15:00
Area:Part of Tran Hung Dao street, part of Chua Moi area
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Son Tay Power Company
Time:From 08:00 to 12:00
Area:Part of Quang Trung Street, Nghia Phu Embankment Area, part of Cau Tri Street
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Son Tay Power Company
Time:From 07:00 to 15:00
Area:Part of Tran Hung Dao street, part of Chua Moi area
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Son Tay Power Company
Time:From 07:00 to 15:00
Area:Van Khe village, part of Nhan Ly village - Xuan Son commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Son Tay Power Company
Time:From 07:00 to 12:00
Area:Part of Nhan Ly village, Van Khe village - Xuan Son commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
----------------------------------
Electricity:Son Tay Power Company
Time:From 08:00 to 12:00
Area:Part of Quang Trung Street, Nghia Phu Embankment Area, part of Cau Tri Street
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Son Tay Power Company
Time:From 08:00 to 12:00
Area:Part of Quang Trung Street, Nghia Phu Embankment Area, part of Cau Tri Street
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Son Tay Power Company
Time:From 07:00 to 15:00
Area:Van Khe village, part of Nhan Ly village - Xuan Son commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Son Tay Power Company
Time:From 07:00 to 12:00
Area:Part of Nhan Ly village, Van Khe village - Xuan Son commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
----------------------------------
Electricity:Son Tay Power Company
Time:From 07:00 to 12:00
Area:Part of Nhan Ly village, Van Khe village - Xuan Son commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
----------------------------------
Electricity:Son Tay Power Company
Time:From 07:00 to 15:00
Area:Van Khe village, part of Nhan Ly village - Xuan Son commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ba Vi Power Company
Time:From 07:00 to 15:00
Area:Customers in Cam Thuong commune (TBA Thang Thac 2)
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Son Tay Power Company
Time:From 08:15 to 11:00
Area:Part of Phung Nghinh company
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Son Tay Power Company
Time:From 08:00 to 12:00
Area:Part of Quang Trung Street, Nghia Phu Embankment Area, part of Cau Tri Street
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ba Vi Power Company
Time:From 07:00 to 15:00
Area:Customers in Cam Thuong commune (TBA Thang Thac 2)
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ba Vi Power Company
Time:From 07:00 to 15:00
Area:Customers in Cam Thuong commune (TBA Thang Thac 2)
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ba Vi Power Company
Time:From 07:00 to 15:00
Area:Customers in Cam Thuong commune (TBA Thang Thac 2)
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ba Vi Power Company
Time:From 07:00 to 15:00
Area:Customers in Cam Thuong commune (TBA Thang Thac 2)
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Dan Phuong Power Company
Time:From 08:00 to 11:00
Area:Part of Phung town
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Dan Phuong Power Company
Time:From 08:00 to 11:00
Area:Part of Phung town
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thach That Power Company
Time:From 07:30 to 13:30
Area:Tan Xa Commune, Kim Quan, Binh Yen
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thach That Power Company
Time:From 07:00 to 15:00
Area:Canh Nau Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thach That Power Company
Time:From 13:00 to 15:30
Area:Kim Quan Commune, Binh Yen, Lien Quan Town
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thach That Power Company
Time:From 07:00 to 15:00
Area:Canh Nau Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thach That Power Company
Time:From 07:00 to 15:00
Area:Canh Nau Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thach That Power Company
Time:From 06:00 to 07:30
Area:Tan Xa Commune, Kim Quan, Binh Yen
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thach That Power Company
Time:From 07:30 to 13:30
Area:Tan Xa Commune, Kim Quan, Binh Yen
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thach That Power Company
Time:From 07:30 to 15:30
Area:Kim Quan Commune, Binh Yen
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thach That Power Company
Time:From 13:00 to 15:30
Area:Kim Quan Commune, Binh Yen, Lien Quan Town
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thach That Power Company
Time:From 06:00 to 07:30
Area:Tan Xa Commune, Kim Quan, Binh Yen
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thach That Power Company
Time:From 07:00 to 15:00
Area:Canh Nau Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thach That Power Company
Time:From 07:30 to 13:30
Area:Tan Xa Commune, Kim Quan, Binh Yen
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thach That Power Company
Time:From 07:30 to 15:30
Area:Kim Quan Commune, Binh Yen
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thach That Power Company
Time:From 13:00 to 15:30
Area:Kim Quan Commune, Binh Yen, Lien Quan Town
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thach That Power Company
Time:From 07:30 to 13:30
Area:Tan Xa Commune, Kim Quan, Binh Yen
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thach That Power Company
Time:From 07:30 to 13:30
Area:Tan Xa Commune, Kim Quan, Binh Yen
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thach That Power Company
Time:From 07:00 to 15:00
Area:Canh Nau Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thach That Power Company
Time:From 07:30 to 13:30
Area:Tan Xa Commune, Kim Quan, Binh Yen
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thach That Power Company
Time:From 07:30 to 13:30
Area:Tan Xa Commune, Kim Quan, Binh Yen
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Quoc Oai Power Company
Time:From 07:00 to 15:00
Area:Part of Dong Yen Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Quoc Oai Power Company
Time:From 07:00 to 15:00
Area:Part of Dong Yen Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Quoc Oai Power Company
Time:From 07:00 to 15:00
Area:Part of Dong Yen Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Quoc Oai Power Company
Time:From 07:00 to 15:00
Area:Part of Dong Yen Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Quoc Oai Power Company
Time:From 07:00 to 15:00
Area:Part of Dong Yen Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Chuong My Power Company
Time:From 07:30 to 15:30
Area:Star Fashion Company Limited
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Chuong My Power Company
Time:From 09:00 to 12:30
Area:Star Fashion Company Limited
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:My Duc Power Company
Time:From 08:00 to 16:00
Area:Part of Van Thai Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:My Duc Power Company
Time:From 08:00 to 16:00
Area:Part of Van Thai Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:My Duc Power Company
Time:From 08:00 to 16:00
Area:Part of Van Thai Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:My Duc Power Company
Time:From 08:00 to 16:00
Area:Part of Van Thai Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Phu Xuyen Power Company
Time:From 08:00 to 16:00
Area:0.4kV power grid after T4 Nam Trieu Pump Substation
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Phu Xuyen Power Company
Time:From 08:00 to 16:00
Area:0.4kV power grid after T4 Nam Trieu Pump Substation
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Phu Xuyen Power Company
Time:From 08:00 to 16:00
Area:0.4kV power grid after T4 Nam Trieu Pump Substation
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Son Tay Power Company
Time:From 08:00 to 12:00
Area:Part of Quang Trung Street, Nghia Phu Embankment Area, part of Cau Tri Street
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoai Duc Electricity Company
Time:From 07:00 to 15:00
Area:Part of Van Con commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoai Duc Electricity Company
Time:From 07:00 to 15:00
Area:Part of Van Con commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoai Duc Electricity Company
Time:From 08:30 to 16:00
Area:Part of An Khanh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoai Duc Electricity Company
Time:From 07:00 to 15:00
Area:Part of Van Con commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoai Duc Electricity Company
Time:From 07:00 to 15:00
Area:Part of Van Con commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoai Duc Electricity Company
Time:From 07:00 to 15:00
Area:Part of Van Con commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoai Duc Electricity Company
Time:From 07:00 to 15:00
Area:Part of Van Canh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoai Duc Electricity Company
Time:From 07:00 to 15:00
Area:Part of Van Canh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoai Duc Electricity Company
Time:From 07:00 to 15:00
Area:Part of Van Con commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoai Duc Electricity Company
Time:From 07:00 to 15:00
Area:Part of Van Con commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoai Duc Electricity Company
Time:From 07:00 to 15:00
Area:Part of Van Con commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoai Duc Electricity Company
Time:From 08:30 to 16:00
Area:Part of An Khanh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoai Duc Electricity Company
Time:From 07:00 to 15:00
Area:Part of Van Con commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoai Duc Electricity Company
Time:From 07:00 to 15:00
Area:Part of Van Con commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Hoai Duc Electricity Company
Time:From 07:00 to 15:00
Area:Part of Van Con commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 06:00 to 11:00
Area:Vietnam International Urban Development Joint Stock Company, Doan Ket Residential Group, Thang Loi, Duong Noi Ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thanh Oai Power Company
Time:From 07:00 to 12:00
Area:Lien Tan Village, Da Ngu, Thi Nguyen
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thanh Oai Power Company
Time:From 07:00 to 12:00
Area:Lien Tan Village, Da Ngu, Thi Nguyen
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thanh Oai Power Company
Time:From 07:00 to 12:00
Area:Lien Tan Village, Da Ngu, Thi Nguyen
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thanh Oai Power Company
Time:From 07:00 to 12:00
Area:Lien Tan Village, Da Ngu, Thi Nguyen
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thanh Oai Power Company
Time:From 07:00 to 12:00
Area:Lien Tan Village, Da Ngu, Thi Nguyen
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thanh Oai Power Company
Time:From 07:00 to 12:00
Area:Lien Tan Village, Da Ngu, Thi Nguyen
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thuong Tin Power Company
Time:From 06:00 to 12:00
Area:Van Diem Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thuong Tin Power Company
Time:From 06:00 to 14:00
Area:Van Tu Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thuong Tin Power Company
Time:From 06:00 to 14:00
Area:Ha Hoi Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
----------------------------------
Electricity:Thuong Tin Power Company
Time:From 06:00 to 12:00
Area:Van Diem Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thuong Tin Power Company
Time:From 06:00 to 14:00
Area:Van Tu Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thuong Tin Power Company
Time:From 06:00 to 14:00
Area:Ha Hoi Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
----------------------------------
Electricity:Thuong Tin Power Company
Time:From 06:00 to 14:00
Area:Van Tu Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thuong Tin Power Company
Time:From 06:00 to 12:00
Area:Van Diem Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thuong Tin Power Company
Time:From 06:00 to 14:00
Area:Ha Hoi Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
----------------------------------
Electricity:Thuong Tin Power Company
Time:From 06:00 to 14:00
Area:Van Tu Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thuong Tin Power Company
Time:From 06:00 to 12:00
Area:Van Diem Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thuong Tin Power Company
Time:From 06:00 to 14:00
Area:Van Tu Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Thuong Tin Power Company
Time:From 06:00 to 12:00
Area:Van Diem Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:My Duc Power Company
Time:From 07:00 to 11:00
Area:Part of Go Mai village, Hop Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:My Duc Power Company
Time:From 07:00 to 11:00
Area:Part of La Dong village, Hop Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:My Duc Power Company
Time:From 07:00 to 09:00
Area:Part of Viem Khe village, Hop Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:My Duc Power Company
Time:From 13:00 to 17:00
Area:Part of La Dong village, Hop Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:My Duc Power Company
Time:From 09:00 to 11:00
Area:Doc Hau village, Doc Tin commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:My Duc Power Company
Time:From 07:00 to 09:00
Area:Part of Viem Khe village, Hop Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:My Duc Power Company
Time:From 13:00 to 17:00
Area:Goc Bang village, An Phu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:My Duc Power Company
Time:From 09:00 to 11:00
Area:Doc Hau village, Doc Tin commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:My Duc Power Company
Time:From 07:00 to 11:00
Area:Part of La Dong village, Hop Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:My Duc Power Company
Time:From 07:00 to 11:00
Area:Part of Go Mai village, Hop Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:My Duc Power Company
Time:From 07:00 to 09:00
Area:Part of Viem Khe village, Hop Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:My Duc Power Company
Time:From 13:00 to 17:00
Area:Part of La Dong village, Hop Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:My Duc Power Company
Time:From 07:00 to 09:00
Area:Part of Viem Khe village, Hop Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:My Duc Power Company
Time:From 13:00 to 17:00
Area:Goc Bang village, An Phu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:My Duc Power Company
Time:From 13:00 to 17:00
Area:Part of La Dong village, Hop Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:My Duc Power Company
Time:From 08:00 to 16:00
Area:Part of Van Thai Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:My Duc Power Company
Time:From 08:00 to 16:00
Area:Part of Van Thai Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:My Duc Power Company
Time:From 08:00 to 16:00
Area:Part of Van Thai Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:My Duc Power Company
Time:From 08:00 to 16:00
Area:Part of Van Thai Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:My Duc Power Company
Time:From 08:00 to 16:00
Area:Part of Van Thai Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Me Linh Power Company
Time:From 06:30 to 16:30
Area:Part of Quang Minh town, Tien Phong commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Me Linh Power Company
Time:From 06:30 to 16:30
Area:Part of Quang Minh town, Tien Phong commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Me Linh Power Company
Time:From 06:30 to 16:30
Area:Part of Quang Minh town, Tien Phong commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Me Linh Power Company
Time:From 06:30 to 16:30
Area:Part of Quang Minh town, Tien Phong commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Me Linh Power Company
Time:From 06:30 to 16:30
Area:Part of Quang Minh town, Tien Phong commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Me Linh Power Company
Time:From 06:30 to 16:30
Area:Part of Quang Minh town, Tien Phong commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Me Linh Power Company
Time:From 06:30 to 16:30
Area:Part of Quang Minh town, Tien Phong commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 08:00 to 12:00
Area:Part of residential group 11, 12, Phu Luong ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 08:00 to 12:00
Area:Part of residential group 11, 12, Phu Luong ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 08:00 to 12:00
Area:Part of residential group 6, Phu Luong ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 08:00 to 12:00
Area:Part of residential group 6, Phu Luong ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 14:00 to 17:00
Area:Part of residential group 13, 14, Phu Luong ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 14:00 to 17:00
Area:Part of residential group 11, 12, Phu Luong ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 06:00 to 11:00
Area:Vietnam International Urban Development Joint Stock Company, Doan Ket Residential Group, Thang Loi, Duong Noi Ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 08:00 to 12:00
Area:Part of residential group 6, Phu Luong ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 14:00 to 17:00
Area:part of residential group 11,14 Dong Mai ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 08:00 to 12:00
Area:part of residential group 12,14 Dong Mai ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 08:00 to 12:00
Area:part of residential group 8,9 Dong Mai ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 14:00 to 17:00
Area:part of residential group 15,16 Dong Mai ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 14:00 to 17:00
Area:part of residential group 11,14 Dong Mai ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 08:00 to 12:00
Area:Part of residential group 11, 12, Phu Luong ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 08:00 to 12:00
Area:Part of residential group 6, Phu Luong ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 08:00 to 12:00
Area:Part of residential group 6, Phu Luong ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 14:00 to 17:00
Area:Part of residential group 13, 14, Phu Luong ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 14:00 to 17:00
Area:part of residential group 11,14 Dong Mai ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 14:00 to 17:00
Area:Part of residential group 11, 12, Phu Luong ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 08:00 to 12:00
Area:Part of residential group 6, Phu Luong ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 08:00 to 12:00
Area:part of residential group 8,9 Dong Mai ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 08:30 to 10:30
Area:Hong Tien Company Limited.
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Ha Dong Electricity Company
Time:From 14:00 to 17:00
Area:Part of residential group 13, 14, Phu Luong ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Bac Tu Liem Power Company
Time:From 08:30 to 10:00
Area:Group 12 Phu Dien Ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Bac Tu Liem Power Company
Time:From 10:30 to 12:30
Area:Group 19 Phu Dien
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Nam Tu Liem Power Company
Time:From 09:00 to 13:00
Area:Click to download a part of Vinhomes Gardnia Cau Dien Low-rise Area - Cau Dien Ward - Nam Tu Liem District - Hanoi
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Bac Tu Liem Power Company
Time:From 07:00 to 12:00
Area:No information yet
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Bac Tu Liem Power Company
Time:From 14:00 to 15:30
Area:Group 20 Phu Dien Ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Bac Tu Liem Power Company
Time:From 08:30 to 10:00
Area:Group 12 Phu Dien Ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Bac Tu Liem Power Company
Time:From 10:30 to 12:30
Area:Group 19 Phu Dien
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Bac Tu Liem Power Company
Time:From 14:00 to 15:30
Area:Group 20 Phu Dien Ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
----------------------------------
Electricity:Bac Tu Liem Power Company
Time:From 16:00 to 17:30
Area:Group 21 Phu Dien Ward
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
----------------------------------
Electricity:Bac Tu Liem Power Company
Time:From 14:00 to 15:30
Area:Group 20 Phu Dien Ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
Above is the power outage schedule for areas in Hanoi on December 11, 2024. Currently, there is no information about power outages in some other locations. Nghe An Newspaper will regularly update the latest and most accurate information about the power outage schedule in Hanoi for readers to follow.
Instructions for looking up power outage schedule in Hanoi
There are many ways to look up power outage schedules, including the following:
Follow Hanoi power outage schedule at Nghe An newspaper
Nghe An Newspaper will regularly update the latest and accurate information about power outage schedule in Hanoi for readers' convenience.
Look up power outage schedule on EVN Hanoi website
To look up the power outage schedule in Hanoi today and the coming days, everyone can access the EVN Hanoi website at the linkhttps://evnhanoi.vn/search/power-cut. Select itemDistrict -> Ward -> From date, To dateto capture information

Search on EVN Customer Service application