Power outage schedule in Hanoi on December 13, 2024
According to Hanoi Electricity, there is a scheduled power outage in districts and towns in Hanoi on December 13, 2024.
The latest information on power outage schedule in Hanoi on Sunday, December 13, 2024 is updated from the Hanoi Electricity portal.
There can be many reasons for power outages in Hanoi. Factors that can cause power outages include natural disasters, floods, storms, or the management unit carrying out repairs and maintenance of power grid lines.

This is the power outage schedule planned by the power companies. Depending on the weather, the power unit's plans... the power outage schedule can be adjusted and postponed in some places.
Hanoi power outage schedule on December 13, 2024
Electricity:Soc Son Power Company
Time:From 06:30 to 14:30
Area:Part of Mai Dinh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 09:30 to 10:45
Area:Part of Bac Phu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 08:30 to 09:45
Area:Part of Kim Lu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 07:30 to 08:45
Area:Part of Phu Linh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 08:30 to 09:45
Area:Part of Phu Linh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 09:30 to 10:45
Area:Part of Phu Linh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 13:30 to 14:45
Area:DHL Customer
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 06:30 to 14:30
Area:Part of Tien Duoc commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 07:30 to 08:45
Area:Part of Phu Linh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 09:30 to 10:45
Area:Part of Phu Linh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Dong Anh Electricity Company
Time:From 07:15 to 13:00
Area:Part of Tien Duong commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Dong Anh Electricity Company
Time:From 07:15 to 13:00
Area:Part of Tien Duong commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Dong Anh Electricity Company
Time:From 07:15 to 13:00
Area:Part of Tien Duong commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Dong Anh Electricity Company
Time:From 07:15 to 13:00
Area:Part of Tien Duong commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Gia Lam Power Company
Time:From 09:00 to 11:00
Area:Thanh Le Trading and Service Company Limited (Nguyen Van Thanh)
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Gia Lam Power Company
Time:From 09:30 to 11:30
Area:Lam Son Hai Company Limited
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 08:00 to 12:00
Area:MBA1, MBA2 Tan Mai 5
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 14:00 to 17:00
Area:Part of the Great Compassion
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ba Dinh Power Company
Time:From 07:00 to 08:00
Area:No (low voltage transmission)
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ba Dinh Power Company
Time:From 10:00 to 11:00
Area:No (low voltage transmission)
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ba Dinh Power Company
Time:From 07:00 to 08:00
Area:No (low voltage transmission)
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ba Dinh Power Company
Time:From 07:00 to 08:00
Area:No (low voltage transmission)
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ba Dinh Power Company
Time:From 08:00 to 09:00
Area:No (low voltage transmission)
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ba Dinh Power Company
Time:From 10:00 to 11:00
Area:No (low voltage transmission)
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ba Dinh Power Company
Time:From 10:00 to 11:00
Area:No (low voltage transmission)
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ba Dinh Power Company
Time:From 08:00 to 09:00
Area:No (low voltage transmission)
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ba Dinh Power Company
Time:From 09:00 to 10:00
Area:No (low voltage T2 replacement)
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ba Dinh Power Company
Time:From 10:00 to 11:00
Area:No (low voltage transmission)
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ba Dinh Power Company
Time:From 08:00 to 15:00
Area:No (Customer transfers MF to supply low voltage load)
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ba Dinh Power Company
Time:From 08:00 to 09:00
Area:No (low voltage transmission)
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoan Kiem Electricity Company
Time:From 00:00 to 10:00
Area:From No. 68 to No. 176 Bach Dang, 133 to No. 251 Bach Dang, Alley 193 Bach Dang, Alley 229 Bach Dang
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoan Kiem Electricity Company
Time:From 00:00 to 10:00
Area:From No. 68 to No. 176 Bach Dang, 133 to No. 251 Bach Dang, Alley 193 Bach Dang, Alley 229 Bach Dang
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoan Kiem Electricity Company
Time:From 00:00 to 10:00
Area:From No. 68 to No. 176 Bach Dang, 133 to No. 251 Bach Dang, Alley 193 Bach Dang, Alley 229 Bach Dang
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Dong Da Electricity Company
Time:From 07:00 to 12:00
Area:Alley 10, 12, 14 Ho Dac Di. No. 91 ÷ 143 Ho Dac Di
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Dong Da Electricity Company
Time:From 07:00 to 12:00
Area:Alley 10, 12, 14 Ho Dac Di. No. 91 ÷ 143 Ho Dac Di
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Dong Da Electricity Company
Time:From 07:00 to 12:00
Area:Alley 10, 12, 14 Ho Dac Di. No. 91 ÷ 143 Ho Dac Di
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Dong Da Electricity Company
Time:From 07:00 to 12:00
Area:Alley 10, 12, 14 Ho Dac Di. No. 91 ÷ 143 Ho Dac Di
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Dong Da Electricity Company
Time:From 07:00 to 12:00
Area:Alley 10, 12, 14 Ho Dac Di. No. 91 ÷ 143 Ho Dac Di
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Thanh Xuan Power Company
Time:From 07:00 to 10:00
Area:No information yet
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Thanh Xuan Power Company
Time:From 08:00 to 11:00
Area:No information yet
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Thanh Xuan Power Company
Time:From 10:00 to 14:00
Area:No information yet
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Thanh Xuan Power Company
Time:From 07:00 to 10:00
Area:No information yet
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Thanh Xuan Power Company
Time:From 08:00 to 11:00
Area:No information yet
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Thanh Xuan Power Company
Time:From 10:00 to 14:00
Area:No information yet
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Thanh Xuan Power Company
Time:From 08:00 to 11:00
Area:No information yet
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Thanh Xuan Power Company
Time:From 08:00 to 11:00
Area:No information yet
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Thanh Xuan Power Company
Time:From 11:00 to 14:00
Area:No information yet
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Thanh Xuan Power Company
Time:From 10:00 to 14:00
Area:No information yet
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Thanh Xuan Power Company
Time:From 07:00 to 10:00
Area:No information yet
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 06:30 to 14:30
Area:Part of Mai Dinh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 08:30 to 09:45
Area:Part of Phu Linh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 08:30 to 09:45
Area:Part of Kim Lu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 09:30 to 10:45
Area:Part of Bac Phu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 06:30 to 14:30
Area:Part of Mai Dinh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 08:00 to 11:30
Area:Part of Tan Minh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 08:30 to 09:45
Area:Part of Kim Lu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 08:30 to 09:45
Area:Part of Phu Linh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 10:30 to 11:45
Area:Part of Tan Hung commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 15:30 to 16:45
Area:Part of Noi Bai Industrial Park
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 13:30 to 16:30
Area:Part of the Great Compassion
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 14:00 to 17:00
Area:Part of the Great Compassion
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 07:00 to 11:00
Area:MBA1, MBA2 T3 Dai Kim
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 07:30 to 11:30
Area:MBA1, MBA2 T7 Dai Kim
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 08:00 to 16:00
Area:Part of Hoang Liet
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 13:00 to 16:00
Area:Ministry of Interior D63
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 08:00 to 12:00
Area:MBA Dai Kim 15 and Cau Tien 2
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 13:30 to 16:30
Area:Part of the Great Compassion
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 14:00 to 17:00
Area:Part of the Great Compassion
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 08:00 to 12:00
Area:MBA1, MBA2 Tan Mai 5
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 08:00 to 16:00
Area:Part of Truong Dinh
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 07:00 to 11:00
Area:MBA1, MBA2 T3 Dai Kim
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 07:30 to 11:30
Area:MBA1, MBA2 T7 Dai Kim
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 08:00 to 16:00
Area:Part of Hoang Liet
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 08:00 to 12:00
Area:MBA Dai Kim 15 and Cau Tien 2
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 13:00 to 16:00
Area:Ministry of Interior D63
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 13:30 to 16:30
Area:Part of the Great Compassion
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 14:00 to 17:00
Area:Part of the Great Compassion
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 08:00 to 12:00
Area:MBA1, MBA2 Tan Mai 5
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 08:00 to 16:00
Area:Part of Truong Dinh
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 08:00 to 16:00
Area:Part of Hoang Liet
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 13:30 to 16:30
Area:Part of the Great Compassion
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 14:00 to 17:00
Area:Part of the Great Compassion
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 08:00 to 12:00
Area:MBA Dai Kim 15 and Cau Tien 2
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 08:00 to 12:00
Area:MBA1, MBA2 Tan Mai 5
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 13:00 to 16:00
Area:Ministry of Interior D63
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 07:00 to 11:00
Area:MBA1, MBA2 T3 Dai Kim
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 08:00 to 12:00
Area:MBA Dai Kim 15 and Cau Tien 2
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoang Mai Power Company
Time:From 08:00 to 16:00
Area:Part of Hoang Liet
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 09:30 to 10:45
Area:Part of Bac Phu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 10:30 to 11:45
Area:Part of Tan Hung commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 09:30 to 10:45
Area:Part of Bac Phu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 09:30 to 10:45
Area:Part of Bac Phu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 13:30 to 14:45
Area:DHL Customer
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 15:30 to 16:45
Area:Part of Noi Bai Industrial Park
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 06:30 to 14:30
Area:Part of Mai Dinh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 06:30 to 14:30
Area:Part of Tien Duoc commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 06:30 to 14:30
Area:Part of Mai Dinh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 08:00 to 11:30
Area:Part of Tan Minh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Soc Son Power Company
Time:From 10:30 to 11:45
Area:Part of Tan Hung commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Thanh Xuan Power Company
Time:From 08:00 to 11:00
Area:No information yet
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ha Dong Electricity Company
Time:From 14:00 to 17:00
Area:Part of residential group 2, Phu Lam ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ha Dong Electricity Company
Time:From 14:00 to 17:00
Area:Part of residential group 2, Phu Lam ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ha Dong Electricity Company
Time:From 08:00 to 12:00
Area:Part of residential group 7, Phu Lam ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ha Dong Electricity Company
Time:From 14:00 to 17:00
Area:Part of residential group 2, Phu Lam ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ha Dong Electricity Company
Time:From 08:00 to 12:00
Area:Part of residential group 7, Phu Lam ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Son Tay Power Company
Time:From 06:30 to 14:30
Area:- Part of Vien Son ward, Part of Le Loi ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Son Tay Power Company
Time:From 06:30 to 14:30
Area:- Part of Vien Son ward, Part of Le Loi ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Son Tay Power Company
Time:From 06:30 to 14:30
Area:- Part of Vien Son ward, Part of Le Loi ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Dan Phuong Power Company
Time:From 08:00 to 11:00
Area:Part of Phung town
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
--------------------------------
Electricity:Dan Phuong Power Company
Time:From 08:00 to 11:00
Area:Part of Phung town
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
--------------------------------
Electricity:Dan Phuong Power Company
Time:From 08:00 to 11:00
Area:Part of Phung town
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
--------------------------------
Electricity:Dan Phuong Power Company
Time:From 08:00 to 11:00
Area:Part of Phung town
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
--------------------------------
Electricity:Dan Phuong Power Company
Time:From 08:00 to 11:00
Area:Part of Phung town
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
--------------------------------
Electricity:Thach That Power Company
Time:From 06:00 to 07:30
Area:Binh Yen Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Thach That Power Company
Time:From 07:30 to 15:30
Area:Binh Yen Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Thach That Power Company
Time:From 13:00 to 15:30
Area:Binh Yen Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Thach That Power Company
Time:From 13:00 to 15:30
Area:Binh Yen Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Quoc Oai Power Company
Time:From 07:00 to 15:00
Area:Part of Dong Xuan Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Quoc Oai Power Company
Time:From 07:00 to 15:00
Area:Part of Quoc Oai town, Yen Son commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Quoc Oai Power Company
Time:From 07:00 to 15:00
Area:Part of Dong Xuan Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Quoc Oai Power Company
Time:From 07:00 to 15:00
Area:Part of Dong Xuan Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Quoc Oai Power Company
Time:From 07:00 to 15:00
Area:Part of Quoc Oai town, Yen Son commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Quoc Oai Power Company
Time:From 07:00 to 15:00
Area:Part of Dong Xuan Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Quoc Oai Power Company
Time:From 07:00 to 15:00
Area:Part of Dong Xuan Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Quoc Oai Power Company
Time:From 07:00 to 15:00
Area:Part of Quoc Oai town, Yen Son commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Quoc Oai Power Company
Time:From 07:00 to 15:00
Area:Part of Quoc Oai town, Yen Son commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Quoc Oai Power Company
Time:From 07:00 to 15:00
Area:Part of Quoc Oai town, Yen Son commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Quoc Oai Power Company
Time:From 07:00 to 15:00
Area:Part of Dong Xuan Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Quoc Oai Power Company
Time:From 07:00 to 15:00
Area:Part of Quoc Oai town, Yen Son commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Chuong My Power Company
Time:From 06:00 to 08:30
Area:Xuan Mai Center
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Chuong My Power Company
Time:From 06:00 to 08:30
Area:Xuan Mai Town, Thuy Xuan Tien Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Chuong My Power Company
Time:From 08:30 to 15:00
Area:Xuan Mai Town, Thuy Xuan Tien Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Chuong My Power Company
Time:From 06:00 to 08:30
Area:Xuan Mai Center
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Chuong My Power Company
Time:From 06:00 to 08:30
Area:Xuan Mai Center
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Chuong My Power Company
Time:From 06:00 to 08:30
Area:Xuan Mai Town, Thuy Xuan Tien Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Chuong My Power Company
Time:From 08:30 to 15:00
Area:Xuan Mai Town, Thuy Xuan Tien Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Chuong My Power Company
Time:From 06:00 to 08:30
Area:Xuan Mai Town, Thuy Xuan Tien Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Chuong My Power Company
Time:From 08:30 to 15:00
Area:Xuan Mai Town, Thuy Xuan Tien Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Chuong My Power Company
Time:From 06:00 to 08:30
Area:Xuan Mai Town, Thuy Xuan Tien Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Chuong My Power Company
Time:From 08:30 to 15:00
Area:Xuan Mai Town, Thuy Xuan Tien Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ung Hoa Power Company
Time:From 08:00 to 16:00
Area:Part of Hoa Xa commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ung Hoa Power Company
Time:From 14:30 to 16:30
Area:Japan Nutrition Company - Hoa Xa commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ung Hoa Power Company
Time:From 08:00 to 16:00
Area:Part of Phuong Tu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ung Hoa Power Company
Time:From 08:05 to 16:00
Area:Part of Phuong Tu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ung Hoa Power Company
Time:From 08:00 to 16:00
Area:Part of Hoa Xa commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ung Hoa Power Company
Time:From 08:00 to 16:00
Area:Part of Phuong Tu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ung Hoa Power Company
Time:From 08:05 to 16:00
Area:Part of Phuong Tu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ung Hoa Power Company
Time:From 08:10 to 16:10
Area:Part of Phuong Tu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ung Hoa Power Company
Time:From 08:00 to 16:00
Area:Part of Phuong Tu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ung Hoa Power Company
Time:From 08:00 to 16:00
Area:Part of Hoa Xa commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ung Hoa Power Company
Time:From 08:10 to 16:10
Area:Part of Phuong Tu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ung Hoa Power Company
Time:From 08:00 to 16:00
Area:Part of Hoa Xa commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ung Hoa Power Company
Time:From 08:05 to 16:00
Area:Part of Phuong Tu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Phu Xuyen Power Company
Time:From 07:00 to 15:00
Area:Part of Phuong Duc, Hong Minh, Phu Tuc communes
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Phu Xuyen Power Company
Time:From 07:00 to 15:00
Area:Part of Phuc Tien commune, Phu Xuyen town.
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Phu Xuyen Power Company
Time:From 07:00 to 15:00
Area:Part of Phuong Duc, Hong Minh, Phu Tuc communes
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Phu Xuyen Power Company
Time:From 07:00 to 15:00
Area:Part of Phuong Duc, Hong Minh, Phu Tuc communes
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Phu Xuyen Power Company
Time:From 07:00 to 15:00
Area:Part of Phuc Tien commune, Phu Xuyen town.
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Phu Xuyen Power Company
Time:From 07:00 to 15:00
Area:Part of Phuong Duc, Hong Minh, Phu Tuc communes
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Phu Xuyen Power Company
Time:From 07:00 to 15:00
Area:Part of Phuong Duc, Hong Minh, Phu Tuc communes
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Phu Xuyen Power Company
Time:From 07:00 to 15:00
Area:Part of Phuong Duc, Hong Minh, Phu Tuc communes
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Phu Xuyen Power Company
Time:From 07:00 to 15:00
Area:Part of Phuong Duc, Hong Minh, Phu Tuc communes
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Phu Xuyen Power Company
Time:From 07:00 to 15:00
Area:Part of Phuong Duc, Hong Minh, Phu Tuc communes
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Phu Xuyen Power Company
Time:From 07:00 to 15:00
Area:Part of Phuong Duc, Hong Minh, Phu Tuc communes
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Phu Xuyen Power Company
Time:From 07:00 to 15:00
Area:Part of Phuong Duc, Hong Minh, Phu Tuc communes
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Phu Xuyen Power Company
Time:From 07:00 to 15:00
Area:Part of Phuc Tien commune, Phu Xuyen town.
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Phu Xuyen Power Company
Time:From 07:00 to 15:00
Area:Part of Phuong Duc, Hong Minh, Phu Tuc communes
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Phu Xuyen Power Company
Time:From 07:00 to 15:00
Area:Part of Phuc Tien commune, Phu Xuyen town.
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Phu Xuyen Power Company
Time:From 07:00 to 15:00
Area:Part of Phuong Duc, Hong Minh, Phu Tuc communes
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Son Tay Power Company
Time:From 06:30 to 14:30
Area:- Part of Vien Son ward, Part of Le Loi ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoai Duc Electricity Company
Time:From 07:30 to 09:30
Area:Part of An Khanh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoai Duc Electricity Company
Time:From 07:30 to 10:30
Area:Part of An Khanh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoai Duc Electricity Company
Time:From 08:30 to 16:00
Area:Part of An Khanh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoai Duc Electricity Company
Time:From 09:30 to 12:30
Area:Part of An Khanh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoai Duc Electricity Company
Time:From 07:30 to 09:30
Area:Part of An Khanh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoai Duc Electricity Company
Time:From 07:30 to 10:30
Area:Part of An Khanh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoai Duc Electricity Company
Time:From 08:30 to 16:00
Area:Part of An Khanh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoai Duc Electricity Company
Time:From 09:30 to 12:30
Area:Part of An Khanh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoai Duc Electricity Company
Time:From 10:30 to 13:30
Area:Part of An Khanh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoai Duc Electricity Company
Time:From 09:30 to 12:30
Area:Part of An Khanh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoai Duc Electricity Company
Time:From 07:30 to 09:30
Area:Part of An Khanh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Hoai Duc Electricity Company
Time:From 07:30 to 10:30
Area:Part of An Khanh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:My Duc Power Company
Time:From 13:00 to 17:00
Area:Apartment Area A31
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Thanh Oai Power Company
Time:From 07:00 to 12:00
Area:Thuong Village, My, Cau - Cu Khe
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Thanh Oai Power Company
Time:From 07:00 to 12:00
Area:Thuong Village, My, Cau - Cu Khe
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Thanh Oai Power Company
Time:From 07:00 to 12:00
Area:Thuong Village, My, Cau - Cu Khe
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Phu Xuyen Power Company
Time:From 07:00 to 15:00
Area:Part of Phuong Duc, Hong Minh, Phu Tuc communes
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Thanh Oai Power Company
Time:From 07:00 to 12:00
Area:Thuong Village, My, Cau - Cu Khe
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Thanh Oai Power Company
Time:From 07:00 to 12:00
Area:Thuong Village, My, Cau - Cu Khe
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Phu Xuyen Power Company
Time:From 07:00 to 15:00
Area:Part of Phuong Duc, Hong Minh, Phu Tuc communes
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Thuong Tin Power Company
Time:From 06:00 to 07:30
Area:Dung Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
--------------------------------
Electricity:Thuong Tin Power Company
Time:From 06:00 to 07:30
Area:Dung Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
--------------------------------
Electricity:Thuong Tin Power Company
Time:From 07:00 to 15:00
Area:Nghiem Xuyen commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
--------------------------------
Electricity:Thuong Tin Power Company
Time:From 07:30 to 15:30
Area:Dung Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
--------------------------------
Electricity:Thuong Tin Power Company
Time:From 13:30 to 15:30
Area:Dung Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
--------------------------------
Electricity:Thuong Tin Power Company
Time:From 06:00 to 07:30
Area:Dung Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
--------------------------------
Electricity:Thuong Tin Power Company
Time:From 07:00 to 15:00
Area:Nghiem Xuyen commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
--------------------------------
Electricity:Thuong Tin Power Company
Time:From 13:30 to 15:30
Area:Dung Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
--------------------------------
Electricity:Thuong Tin Power Company
Time:From 06:00 to 07:30
Area:Dung Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
--------------------------------
Electricity:Thuong Tin Power Company
Time:From 07:30 to 15:30
Area:Dung Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
--------------------------------
Electricity:Thuong Tin Power Company
Time:From 06:00 to 07:30
Area:Dung Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
--------------------------------
Electricity:Thuong Tin Power Company
Time:From 06:00 to 07:30
Area:Dung Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
--------------------------------
Electricity:Thuong Tin Power Company
Time:From 13:30 to 15:30
Area:Dung Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
--------------------------------
Electricity:Thuong Tin Power Company
Time:From 07:00 to 15:00
Area:Nghiem Xuyen commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
--------------------------------
Electricity:Thuong Tin Power Company
Time:From 06:00 to 07:30
Area:Dung Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
--------------------------------
Electricity:Thuong Tin Power Company
Time:From 13:30 to 15:30
Area:Dung Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
--------------------------------
Electricity:Thuong Tin Power Company
Time:From 06:00 to 07:30
Area:Dung Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
--------------------------------
Electricity:Thuong Tin Power Company
Time:From 06:00 to 07:30
Area:Dung Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
--------------------------------
Electricity:Thuong Tin Power Company
Time:From 07:00 to 15:00
Area:Nghiem Xuyen commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
--------------------------------
Electricity:Thuong Tin Power Company
Time:From 07:30 to 15:30
Area:Dung Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
--------------------------------
Electricity:Thuong Tin Power Company
Time:From 13:30 to 15:30
Area:Dung Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
--------------------------------
Electricity:Thuong Tin Power Company
Time:From 06:00 to 07:30
Area:Dung Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
--------------------------------
Electricity:Thuong Tin Power Company
Time:From 07:00 to 15:00
Area:Nghiem Xuyen commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
--------------------------------
Electricity:Thuong Tin Power Company
Time:From 13:30 to 15:30
Area:Dung Tien commune
Reason:Serving the renovation and upgrading of the power grid
Status:Postpone
--------------------------------
Electricity:My Duc Power Company
Time:From 07:00 to 15:00
Area:Part of Xuy Xa commune (TBA Nghia 1, Xuy Xa Thuong 2, Xuy Xa Thuong, Bom Xuy Xa), part of Duc Thu village, Le Thanh commune (TBA Le Thanh 11), Bom Xuy Xa and Ngoc Anh Company.
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:My Duc Power Company
Time:From 07:00 to 15:00
Area:Part of Tuy Lai commune (Dinh Le substation, Tru Cat and Tru 2 village)
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:My Duc Power Company
Time:From 13:00 to 17:00
Area:Apartment Area A31
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:My Duc Power Company
Time:From 13:00 to 17:00
Area:Part of Dong Tam commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:My Duc Power Company
Time:From 07:00 to 15:00
Area:Part of Tuy Lai commune (Dinh Le substation, Tru Cat and Tru 2 village)
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:My Duc Power Company
Time:From 13:00 to 17:00
Area:Apartment Area A31
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:My Duc Power Company
Time:From 13:00 to 17:00
Area:Part of Dong Tam commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:My Duc Power Company
Time:From 07:00 to 15:00
Area:Part of Xuy Xa commune (TBA Nghia 1, Xuy Xa Thuong 2, Xuy Xa Thuong, Bom Xuy Xa), part of Duc Thu village, Le Thanh commune (TBA Le Thanh 11), Bom Xuy Xa and Ngoc Anh Company.
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:My Duc Power Company
Time:From 13:00 to 17:00
Area:Part of Dong Tam commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:My Duc Power Company
Time:From 07:00 to 15:00
Area:Part of Tuy Lai commune (Dinh Le substation, Tru Cat and Tru 2 village)
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:My Duc Power Company
Time:From 07:00 to 11:30
Area:Part of Quyt village, Tuy Lai commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:My Duc Power Company
Time:From 07:00 to 11:30
Area:Ben village, Tuy Lai commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:My Duc Power Company
Time:From 07:00 to 15:00
Area:Part of Xuy Xa commune (TBA Nghia 1, Xuy Xa Thuong 2, Xuy Xa Thuong, Bom Xuy Xa), part of Duc Thu village, Le Thanh commune (TBA Le Thanh 11), Bom Xuy Xa and Ngoc Anh Company.
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:My Duc Power Company
Time:From 07:00 to 11:30
Area:Ben village, Tuy Lai commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:My Duc Power Company
Time:From 07:00 to 15:00
Area:Part of Xuy Xa commune (TBA Nghia 1, Xuy Xa Thuong 2, Xuy Xa Thuong, Bom Xuy Xa), part of Duc Thu village, Le Thanh commune (TBA Le Thanh 11), Bom Xuy Xa and Ngoc Anh Company.
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:My Duc Power Company
Time:From 07:00 to 15:00
Area:Part of Xuy Xa commune (TBA Nghia 1, Xuy Xa Thuong 2, Xuy Xa Thuong, Bom Xuy Xa), part of Duc Thu village, Le Thanh commune (TBA Le Thanh 11), Bom Xuy Xa and Ngoc Anh Company.
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:My Duc Power Company
Time:From 07:00 to 15:00
Area:Part of Tuy Lai commune (Dinh Le substation, Tru Cat and Tru 2 village)
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:My Duc Power Company
Time:From 08:00 to 11:00
Area:Part of Hop Thanh commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ung Hoa Power Company
Time:From 08:00 to 16:00
Area:Part of Phuong Tu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ung Hoa Power Company
Time:From 08:00 to 16:00
Area:Part of Hoa Xa commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ung Hoa Power Company
Time:From 08:05 to 16:00
Area:Part of Phuong Tu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ung Hoa Power Company
Time:From 08:05 to 16:00
Area:Part of Phuong Tu commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ung Hoa Power Company
Time:From 08:00 to 16:00
Area:Part of Hoa Xa commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ung Hoa Power Company
Time:From 08:00 to 16:00
Area:Part of Hoa Xa commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Me Linh Power Company
Time:From 07:00 to 17:00
Area:Part of Dai Thinh commune, Me Linh
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Me Linh Power Company
Time:From 07:45 to 16:15
Area:Part of Tam Dong commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Me Linh Power Company
Time:From 07:00 to 17:00
Area:Part of Dai Thinh commune, Me Linh
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Me Linh Power Company
Time:From 07:45 to 16:15
Area:Part of Tam Dong commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Me Linh Power Company
Time:From 07:00 to 17:00
Area:Part of Dai Thinh commune, Me Linh
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Me Linh Power Company
Time:From 07:45 to 16:15
Area:Part of Tam Dong commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Me Linh Power Company
Time:From 07:00 to 17:00
Area:Part of Dai Thinh commune, Me Linh
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Me Linh Power Company
Time:From 07:45 to 16:15
Area:Part of Tam Dong commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Me Linh Power Company
Time:From 07:00 to 17:00
Area:Part of Dai Thinh commune, Me Linh
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ha Dong Electricity Company
Time:From 08:00 to 12:00
Area:Part of residential group 7, Phu Lam ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ha Dong Electricity Company
Time:From 08:00 to 12:00
Area:Part of residential group 5, Phu Lam ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ha Dong Electricity Company
Time:From 08:00 to 12:00
Area:Part of residential group 7, Phu Lam ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ha Dong Electricity Company
Time:From 14:00 to 17:00
Area:Part of residential group 2, Phu Lam ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ha Dong Electricity Company
Time:From 14:00 to 17:00
Area:Part of residential group 2, Phu Lam ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ha Dong Electricity Company
Time:From 08:00 to 12:00
Area:Part of residential group 5, Phu Lam ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Ha Dong Electricity Company
Time:From 08:00 to 12:00
Area:Part of residential group 7, Phu Lam ward
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Quoc Oai Power Company
Time:From 07:00 to 15:00
Area:Part of Dong Xuan Commune
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Bac Tu Liem Power Company
Time:From 07:00 to 09:00
Area:No information yet
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Bac Tu Liem Power Company
Time:From 08:00 to 12:00
Area:No information yet
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Bac Tu Liem Power Company
Time:From 08:00 to 16:30
Area:H8 - 1
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Bac Tu Liem Power Company
Time:From 08:00 to 16:00
Area:Tuan Loan 2 Joint Stock Company
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Bac Tu Liem Power Company
Time:From 08:00 to 16:00
Area:N02 Mechanical 6
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Bac Tu Liem Power Company
Time:From 08:00 to 12:00
Area:No information yet
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Bac Tu Liem Power Company
Time:From 08:00 to 12:00
Area:No information yet
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Bac Tu Liem Power Company
Time:From 08:00 to 12:00
Area:No information yet
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
--------------------------------
Electricity:Bac Tu Liem Power Company
Time:From 08:00 to 12:00
Area:No information yet
Reason:Serving the renovation and upgrading of the power grid
Status:Approved
Above is the power outage schedule for areas in Hanoi on December 13, 2024. Currently, there is no information about power outages in some other locations. Nghe An Newspaper will regularly update the latest and most accurate information about the power outage schedule in Hanoi for readers to follow.
Instructions for looking up power outage schedule in Hanoi
There are many ways to look up power outage schedules, including the following:
Follow Hanoi power outage schedule at Nghe An newspaper
Nghe An Newspaper will regularly update the latest and accurate information about power outage schedule in Hanoi for readers' convenience.
Look up power outage schedule on EVN Hanoi website
To look up the power outage schedule in Hanoi today and the coming days, everyone can access the EVN Hanoi website at the linkhttps://evnhanoi.vn/search/power-cut. Select itemDistrict -> Ward -> From date, To dateto capture information

Search on EVN Customer Service application
Everyone downloads the EVN Customer Service application to their phone and registers for an account. Next, select the “Power outage schedule” section to see the exact Hanoi power outage schedule right on your phone.