Friday, DNUM_FZJZCACF
Vietnamese
Vietnamese
English
French
Russia
中文
Nghe An News
Nghe An Daily Newspaper
Nghe An weekend
Log in
Nghe An Newspaper:
Nghe An Television:
Latest
News
Forum
Human Resources
Party Building
Everyday beauty
Protect the ideological foundation
Economy
Industrial
New rural construction
Agriculture
Market
Agricultural extension
Real estate
Car
International
Comment
News
Society
Bridge of love
Religion - Belief
Culture
Defense
Tourism
Poetry - Stories
Anti-waste
Streamline the organization
Education
Law
Security - Order
Advise
Case file
Sport
SLNA
Highlight
Domestic
Nghe An Newspaper Cup
International
Business Connection
Classifieds
New policy
Television
Society
Sport
National defense and security
Reportage - Chronicle
Cars and life
News
Discover
Entertainment
People ask, authorities answer
TV
Image
Health
Advise
Medicine & Nutrition
Health & Beauty
News
Labor
Job
Latest
Nghe An News
Nghe An Daily Newspaper
Nghe An weekend
News
Forum
Human Resources
Party Building
Everyday beauty
Protect the ideological foundation
Economy
Industrial
New rural construction
Agriculture
Market
Agricultural extension
Real estate
Car
International
Comment
News
Society
Bridge of love
Religion - Belief
Culture
Defense
Tourism
Poetry - Stories
Anti-waste
Streamline the organization
Education
Law
Security - Order
Advise
Case file
Sport
SLNA
Highlight
Domestic
Nghe An Newspaper Cup
International
Business Connection
Classifieds
New policy
Television
Society
Sport
National defense and security
Reportage - Chronicle
Cars and life
News
Discover
Entertainment
People ask, authorities answer
TV
Image
Health
Advise
Medicine & Nutrition
Health & Beauty
News
Labor
Job
Entertainment
Showbiz
Short Video
Reflection
Digital Transformation
Technology
Infographics
eMagazine
Podcast
Nghe
Literature and art
Go to Nghe An
Land and People
West
Reportage
Party Congress
National Party Congress
Nghe An Provincial Party Congresses
Nghe An Provincial Party Executive Committee
Party Congresses at all levels for the 2025 - 2030 term
Comments on Documents
News
Q&A
List of delegates
downstream
News updates related to downstream
Ban Ve Hydropower Plant actively regulates water, contributing to flood reduction of about 74% for downstream areas.
Facing the risk of flooding due to the impact of storm No. 5, Ban Ve Hydropower Plant plays an important role by proactively reducing discharge, contributing to cutting floods by about 74% for the downstream of Lam River, especially in the old Con Cuong district - where there is prolonged heavy rain.
Law
Ban Ve Hydropower Plant proactively reduces floods and protects downstream areas from the impact of storm No. 5
Faced with the direct impact of storm No. 5 causing heavy rain in the upstream area, Ban Ve Hydropower Plant has proactively implemented measures to regulate the reservoir to minimize the risk of flooding in the downstream area.
Leaders of Power Generation Corporation 1 directly commanded at Ban Ve Hydropower Plant, proactively responding to storm No. 5, ensuring safety for downstream areas.
Faced with the complicated developments and risk of serious impacts from storm No. 5, on August 25, leaders of Power Generation Corporation 1 (EVNGENCO1) were present at Ban Ve Hydropower Plant to inspect the situation and direct flood response work.
From 3:30 p.m. this afternoon (August 23), Ban Ve Hydropower Company will lower the lake water level to welcome floods.
Implementing the Order of the Head of the Steering Committee for Natural Disaster Prevention, Search and Rescue and Civil Defense of Nghe An province, from 3:30 p.m. this afternoon (August 23), Ban Ve Hydropower Company will lower the lake water level to welcome floods.
Water flow to Ban Ve hydroelectric reservoir continues to decrease, the plant regulates flood reduction for downstream
On July 26, the water flow to Ban Ve hydroelectric reservoir was 1,100m3/s, this is the lowest level in recent days of flooding.
Chairman of Nghe An Provincial People's Committee Le Hong Vinh inspected natural disaster prevention and control work in downstream communes.
On the morning of July 25, comrade Le Hong Vinh - Deputy Secretary of the Provincial Party Committee, Chairman of the People's Committee of Nghe An province inspected flood prevention work in communes in the downstream area of Ca River.
Officials were directly present at the facility, working with people along Lam River to cope with the flood all night.
Due to the unusual developments of floods and hydropower plants releasing water from upstream, many localities downstream of Lam River were deeply flooded and isolated. Authorities at all levels in Nghe An promptly mobilized forces, directly present at the grassroots level, and joined the people in responding and urgently evacuating people and property to safety.
Nghe An directs to ensure downstream safety when floods in the upper reaches of rivers in Nghe An are rising.
DNUM_CDZAHZCACF 22:21
On the evening of July 23, the Provincial Steering Committee for Natural Disaster Prevention, Search and Rescue and Civil Defense issued Official Dispatch No. 154/VP-PCTT, directing measures to ensure safety downstream when floods on the upper reaches of rivers in Nghe An are rising.
Khe Bo Hydropower Plant promptly regulates and ensures the safety of the reservoir and downstream areas during floods.
DNUM_CDZAHZCACF 14:45
Faced with the complicated situation of rising flood water, Khe Bo Hydropower Plant has activated a flood response plan, urgently regulated the reservoir, and strengthened measures to ensure the safety of the project and downstream areas.
Localities in the downstream of Nghe An proactively respond to upstream floods
DNUM_CDZAHZCACF 12:43
Although the rain has stopped after the storm, floodwaters from upstream are still pouring in, causing many localities downstream of the Lam River in Nghe An to face the risk of flooding and landslides. Localities have proactively developed response plans to protect people, crops and property, and minimize possible damage.
Flood exceeds peak, Ban Ve Hydropower Plant cuts 74% of flow downstream
DNUM_CDZAHZCACF 11:51
Due to the impact of storm No. 3, an exceptionally large flood occurred in the Ban Ve Hydropower Reservoir basin, exceeding the flood control frequency, with a peak flow of up to 12,800 m³/s at 2:00 a.m. on July 23. In the face of the emergency, Ban Ve Hydropower Company promptly switched to an unusual operation mode, cutting down 74% of the flood flow downstream, contributing significantly to limiting damage caused by flooding.
Closely monitor the water flow into Ban Ve hydroelectric reservoir, regulate appropriately to reduce flooding in downstream areas.
DNUM_CDZAHZCACF 11:34
On the morning of July 23, a working delegation of the Department of Agriculture and Environment led by Mr. Hoang Quoc Viet - Member of the Provincial Party Committee, Director of the Department inspected the response to floods caused by storm No. 3 in the western localities of Nghe An. Accompanying him were Mr. Nguyen Truong Thanh - Head of the Irrigation Sub-Department and other members of the delegation.
Song Sao Reservoir discharges floodwaters until the rain stops to ensure the safety of downstream reservoirs.
DNUM_CCZAHZCACF 21:25
Due to the impact of storm No. 3 causing prolonged heavy rain, from July 22, Phu Quy Irrigation Company Limited has discharged floodwater from Song Sao reservoir (Nghia Lam commune) to ensure safety for the project and downstream areas.
Ban Ve Hydropower Plant will regulate discharge from 4:00 p.m. today (July 22) to reduce downstream pressure.
DNUM_CCZAHZCACF 12:31
In order to ensure safety for the downstream area in the face of complicated flood and rain situations, Ban Ve Hydropower Company announced that it will operate the reservoir and discharge water starting from 4:00 p.m. on July 22 under the direction of the Steering Committee for Natural Disaster Prevention, Search and Rescue and Civil Defense of Nghe An province.
Ban Ve Hydropower Company proactively responds to storm No. 3, promoting the motto '4 on-site'
DNUM_CBZAHZCACF 17:56
Faced with the complex and unpredictable developments of storm No. 3 (international name Wipha), Ban Ve Hydropower Company has urgently, synchronously and drastically deployed many solutions to prevent and combat natural disasters to ensure absolute safety for the project and the downstream area. Not only stopping at implementing the instructions of the superiors, the Company has also proactively developed and implemented early response plans, carefully and thoughtfully prepared according to the motto "4 on-site".
Discharging water from Nam Mo Hydropower Reservoir: People in downstream areas need to take proactive measures to prevent
DNUM_CJZAGZCACF 15:17
The Steering Committee for Natural Disaster Prevention and Control - Search and Rescue of Nghe An province has just issued an urgent notice on the operation of releasing water from the Nam Mo hydropower reservoir in Ta Ca commune, Ky Son district, starting from the afternoon of June 29, 2025. People in the downstream area are advised to be vigilant and proactive in responding to ensure the safety of life and property.
Strengthening warning and disaster prevention for the downstream area of Ban Ve Hydropower Plant
DNUM_ABZAEZCACF 16:35
This is one of the important contents presented at the Conference to review the work of natural disaster prevention, control and search and rescue (PCTT&TKCN) in 2024 and deploy tasks in 2025 of Ban Ve Hydropower Company.
Ban Ve Hydropower Company to reach 1 billion kWh of electricity output in 2024
DNUM_BDZBAZCACE 09:57
On September 10, Ban Ve Hydropower Company completed the electricity output plan assigned by Power Generation Corporation 1 in 2024 (774 million kWh) and at 2:14 p.m. on October 11, the company reached the milestone of producing 1 billion kWh of electricity, approximately equal to the average electricity output of many years (1,012 million kWh).
Nghe An province directs Ban Ve hydropower plant to operate to reduce flooding downstream
DNUM_BHZAJZCACE 20:31
Nghe An Provincial People's Committee has just issued Official Dispatch No. 203/BCH-PCTT dated September 17, 2024 on flood reduction operation order for downstream areas of Ban Ve Hydropower Plant.
Ensuring safety when operating flood reduction for the downstream of Ban Ve Lake
DNUM_AHZAJZCACE 14:05
The Provincial Steering Committee for Natural Disaster Prevention - Search and Rescue and Civil Defense has issued Official Dispatch No. 171/VP-PCTT on ensuring safety when operating flood reduction for the downstream of Ban Ve Lake.
Nghe An operates Ban Ve hydroelectric reservoir to cut and reduce floods downstream
DNUM_CHZAIZCACE 12:28
On the morning of August 27, the Steering Committee for Natural Disaster Prevention, Search and Rescue and Civil Defense of Nghe An province issued two urgent documents on the operation of Ban Ve hydropower reservoir to cut and reduce floods; and ensure safety in downstream areas.
Ban Ve Hydropower Plant informs people in downstream areas about flood prevention solutions
DNUM_BGZAIZCACE 12:18
On August 15 and 16, in Luong Minh and Huu Khuong communes (Tuong Duong), Ban Ve Hydropower Company held a media conference on Ban Ve Hydropower and disaster prevention and control.
See more
POWERED BY
ONE
CMS
- A PRODUCT OF
NEKO