Telegram on responding to storm No. 4

PV DNUM_BFZAIZCABI 21:08

(Baonghean.vn) - At 7:00 p.m. on August 15, the Provincial Steering Committee for Natural Disaster Prevention and Search and Rescue issued telegram No. 11 on responding to storm No. 4.

The content of the telegram clearly stated that, according to the news of the National Center for Hydro-Meteorological Forecasting,at 4:00 p.m. on August 15,The center of the storm is located at about 20.9 degrees North latitude; 111.1 degrees East longitude, in the sea south of Guangdong province (China). The strongest wind near the center of the storm is level 9.level 11. The range of strong winds of level 6, gusting to level 8 is about 110km from the center of the storm.

Forecast for the next 24 hours,The storm is moving in a West-Southwest direction, traveling about 10km per hour. At 4:00 p.m. on August 16, the center of the storm was at about 20.3 degrees North latitude; 109.0 degrees East longitude, in the eastern area of ​​the Gulf of Tonkin, 210km from Mong Cai, 270km from Thai Binh, and 410km from Vinh. Due to the influence of the storm, the northern East Sea area has strong winds of level 6; the northwest of the northern East Sea area has stormy rain, strong winds of level 7, the area near the storm center has strong winds of level 8, gusts of level 11. The sea is rough. From early tomorrow morning (August 16), in the eastern part of the Gulf of Tonkin, the wind will gradually increase to level 6-7, the area near the storm center will have winds of level 8-9,level 11. Very rough seas. Dangerous areas in the East Sea in the next 24 hours (strong wind level 6 or higher): North of latitude 19.0 degrees North; East of longitude 107.5 degrees East. Natural disaster risk level due to storm: level 3.

To proactively and effectively respond to storms, the Provincial Steering Committee for Natural Disaster Prevention and Control and Search and Rescue requests the Chairman and Head of the Steering Committee for Natural Disaster Prevention and Control and Search and Rescue of districts, cities and towns; the Provincial Military Command, the Provincial Border Guard Command, Directors of Departments, Heads of Provincial-level Committees and Branches; Directors of Irrigation and Hydropower Companies in the province and related units to direct the implementation of the following contents:

1. Strictly implement the contents of Official Dispatch No. 37 dated August 13, 2018 of the Central Steering Committee on Disaster Prevention and Control; Official Dispatch No. 10 dated August 13, 2018 of the Provincial Steering Committee for Disaster Prevention and Control and Search and Rescue.

2. For sea routes:

- Strictly manage the departure of ships; The Provincial Border Guard Command, based on the specific situation, advises the Provincial People's Committee to decide on the sea ban;

- Organize monitoring and counting of vessels operating at sea, maintain regular communication with vehicle owners to promptly handle any bad situations that may occur;

- Check and guide the anchoring of boats at anchorage areas, coastal shelters, in rivers and especially around islands; absolutely do not let people stay in cages, watchtowers, or boats;

- Proactively deploy plans to ensure safety of people and property for tourism activities, on islands and coastal and inland aquaculture cages.

3. For land areas:

- Direct and guide people to brace houses, billboards, and prune tree branches;

- Implement plans to ensure safety for public works, ports, coastal industrial parks, large projects under construction, warehouses, mines, power transmission systems, and mineral exploitation waste dumps.

4. Mountainous districts:Check and review areas at risk of flash floods and landslides, notify people to proactively prevent and resolutely evacuate people from dangerous areas. Organize warning signs, patrol and guard flooded areas, deeply flooded roads and strictly prohibit collecting firewood during floods.

5. Safety inspection and operation of works in irrigation systems; actively operate drainage pumps, especially in urban areas and areas with low-growing rice fields when flooding occurs.

6. For irrigation and hydroelectric reservoirs:

- Implement plans to ensure the safety of reservoir works when there is a risk of an incident, especially handling the first hour;

- Increase 24/7 on-duty at the construction site during periods of heavy rain and floods, closely monitor water levels and flow to the reservoir to have appropriate operating plans;

- Continuously update the situation, calculate the operation plan of the hydroelectric reservoirs and base on the actual situation to direct appropriate operations;

7. Check and implement reinforcement measures to ensure the safety of the dike system; especially key weak points, incidents caused by storm No. 3 and floods in July 2018 have not been resolved.

8. The North Central Hydrometeorological Station regularly and promptly updates information on rain and flow to provide to the Provincial People's Committee, the Provincial Steering Committee for Disaster Prevention and Control, and relevant agencies and units to operate the Ban Ve, Khe Bo, and Chi Khe reservoirs.

9. Prepare forces and means for rescue when requested.

10. Provincial Radio and Television Station, Nghe An Newspaper, Ben Thuy Coastal Information Station and mass media increase broadcasting time, report on storm and flood developments so that authorities at all levels and people can proactively take precautions.

11. Be on duty 24/7 to monitor the storm's developments, proactively direct responses to possible bad situations. Regularly report on storms, floods and incidents to the Standing Office of the Provincial Steering Committee for Disaster Prevention and Control for timely handling./

Featured Nghe An Newspaper

Latest

x
Telegram on responding to storm No. 4
POWERED BYONECMS- A PRODUCT OFNEKO