Speed ​​up construction of key projects in rice-growing districts

Hai An DNUM_CEZADZCABJ 09:05

(Baonghean) - Right from the beginning of 2019, Yen Thanh District People's Committee has focused on directing site clearance for projects in the area, while actively urging construction units to speed up the progress of key projects, soon putting them into use to serve the local socio-economic development.

At this time, the road connecting the original relic site of Chi Linh pagoda to the spiritual area of ​​Ru Gam festival in Xuan Thanh commune is actively under construction. This road serves both the economic development of the locality and the spiritual needs of the people.

Mr. Nguyen Xuan Hao, the commander of the construction unit, said: “From the beginning of the year, we have deployed human resources and machinery for construction. Despite the financial difficulties, the unit has completed the foundation, paved 1.2/2 km of asphalt, and is completing the 24 m long bridge over the canal. Currently, the unit is mobilizing the maximum number of workers and machinery to speed up the construction progress, expected to be put into use by June 2019.

However, the biggest difficulty now is that about 200m in hamlet 8, Xuan Thanh commune is stuck with compensation for land acquisition. The construction unit requests that relevant departments coordinate to quickly find a solution for compensation for land acquisition so that the unit can carry out construction on schedule.

Lao dầm cầu bắc qua sông Đào đi qua xã Xuân Thành (Yên Thành).
Construction of the bridge over the Dao River passing through Xuan Thanh commune (Yen Thanh).

The project to upgrade the road from Yen Thanh town to Duc Thanh commune was started in 2016 with a length of 4.4 km. At this time, over 90% of the volume has been completed, the road has been paved and auxiliary items such as ditches, drainage ditches are being completed.

It is known that this road has been seriously degraded for a long time, and in the rainy season it is muddy, making it very difficult for vehicles to travel. After this road was paved, it helped people in Yen Thanh town and Van Thanh, Phuc Thanh and Duc Thanh communes to travel conveniently.

Yên Thành xây dựng 15 mô hình sản xuất nông nghiệp ứng dụng công nghệ cao

Yen Thanh builds 15 high-tech agricultural production models

(Baonghean) - As a key agricultural area of ​​the province, Yen Thanh district always faces many natural disasters, droughts, floods and pests. Faced with that reality, in recent years, people have boldly applied high-tech agriculture to production and achieved initial results.

Tạo lực mới trong thu hút đầu tư ở Yên Thành

Creating new momentum in attracting investment in Yen Thanh

(Baonghean) - Yen Thanh district focuses all resources, creating an open environment to attract investment projects. During that process, the district has strengthened planning, site clearance, and construction of technical infrastructure for industrial clusters, which has been recognized by the business community.

Yen Thanh district is also continuing to direct and urge the completion of roads, including inner-city roads designed according to urban traffic standards type IV, the hospital road to Hop Thanh, inter-commune roads Do Thanh, Tho Thanh, and road 538b to the main canal of Yen Thanh town.

Several projects have been and are being implemented and contributing to improving production capacity, flood and storm prevention, and natural disaster mitigation. These include: the rescue road of So River, Phu Thanh Commune, along Vach Bac Canal, the project to upgrade the flood drainage system of Bau Chen - Trung Long River from Cong Thanh Commune to Long Thanh, the project to upgrade the embankment to prevent landslides and flood drainage of Dien Yen II, the craft village road of Long Thanh Commune, etc.

Một góc Xã Long Thành.
A corner of Long Thanh Commune (Yen Thanh).

At the same time, the reservoirs are also being repaired. Khe Noc reservoir in Son Thanh commune started construction in 2018 with a value of 12 billion VND, currently has reached over 80% progress, completed the upstream roof, spillway, water intake, irrigation canal... Representative of Son Thanh commune People's Committee said: Khe Noc reservoir put into use will ensure irrigation for more than 70 hectares of local cultivated land, provide domestic water for people and livestock, contributing to creating landscape and ecological environment.

Yen Thanh district has over 120 large and small reservoirs, most of which are degraded, of which over 30% have been upgraded. According to the plan, the district continues to prioritize capital sources to upgrade weak reservoirs, ensuring irrigation water and flood protection for the people.

The field of basic construction investment in Yen Thanh district has had positive changes, thanks to good planning, survey and design, project appraisal and strengthening of construction management, especially the progress of key projects. Along with that, the district has done a good job of site clearance and regularly paid attention to and promptly removed difficulties and obstacles for construction units, so that investment projects and works were implemented quickly, ensuring progress as well as quality. According to the plan in 2019, the district strives to complete over 40 traffic, irrigation and school works, disbursing about over 200 billion VND.

Mr. Nguyen Van Tuan - Head of Yen Thanh District Construction Project Management Board

Accelerating the construction progress of basic construction works in Yen Thanh area aims to ensure the completion and handover of works for use according to plan, contributing to the implementation of socio-economic development goals in the locality.



Featured Nghe An Newspaper

Latest

x
Speed ​​up construction of key projects in rice-growing districts
POWERED BYONECMS- A PRODUCT OFNEKO