Approval of adjustment of planning for Coastal Highway, section through Son Hai urban area (Quynh Luu)
(Baonghean.vn) - Nghe An Provincial People's Committee has issued Decision No. 3023/QD-UBND approving local adjustments to the coastal national highway planning route under the Son Hai urban construction master plan, Quynh Luu district.
Specifically, according to Decision No. 3023/QD-UBND dated September 22, 2023 of Nghe An Provincial People's Committee, the following main contents are stated:
Reason for planning adjustment: ProjectSon Hai urban construction master plan, Quynh Luu district was approved by the Provincial People's Committee in Decision No. 493/QD-UBND dated February 4, 2013, accordingly,coastal highwayplanned to run through Son Hai urban area with a road width of 60m, length of 1.235 km, route direction: section 1 Northeast - Southwest, about 970m long from Thai River to the intersection of the 30m wide planned road; section 2 Northwest - Southeast, about 265m long from the intersection of the 30m wide planned road to the end of Son Hai urban boundary. Currently, the above coastal National Highway has been adjusted in direction according to Document No. 1453/TTg-CN dated September 26, 2017 of the Prime Minister, does not pass through Son Hai urban area and does not coincide with the route direction as approved in the planning.
Therefore, it is necessary to adjust the planning to ensure land management, planning management and construction investment in Quynh Luu district. The above-mentioned partial adjustment of the planning has been approved in principle by the Provincial People's Committee in Official Dispatch No. 5570/UBND-CN dated July 10, 2023.

Regarding approved planning and local planning adjustment content:According to the approved planning, the route has a right of way of 60m, a length of about 1,235m and is divided into 2 sections, including: section 1 is about 970m long from Thai River to the intersection of the 30m wide planned road; section 2 is about 265m long, from the intersection of the 30m wide planned road to the end of Son Hai urban boundary.

Content of local planning adjustment: Cancel section 1 about 970m long fromThai Riverto the intersection of the 30m wide planned road; at the same time, adjust the road boundary of section 2, from 60m, length 265m, from the 30m wide planned road to the end of the Son Hai urban boundary. After adjustment, this road section coincides with the 30m wide planned road according to the approved general planning of Son Hai urban construction and has the following cross-section: 30m wide road, 7.5 x 2m roadway, 5.0 x 2m sidewalk; 5m wide median strip (cross-section symbol BB in the planning drawing).

In this document, the Provincial People's Committee approves the drawing attached to the Local Adjustment of the coastal national highway planning route under the Master Plan and Urban Construction Project of Son Hai, Quynh Luu District; at the same time, assigns the Quynh Luu District People's Committee to coordinate with the Department of Construction and relevant agencies to organize the announcement, update and management of the planning according to regulations; relevant departments and branches, based on the approved planning, coordinate with the Quynh Luu District People's Committee to implement the next steps in accordance with current regulations. The Decision takes effect from the date of signing and promulgation (September 22, 2023)./.